20
07.3
ASSEMBLY SEQUENCE
The fireplace travels on pallet. To facilitate assembly and transport open the fireplace and remove the various components.(
F
ig
. 1-2
)
;
Phase 1:
Before positioning the fireplace and in case of purchase of the humidifier kit, for the models providing for this, proceed with the
related assembly (see point a); in case of humidifier kit assembly, it is necessary to prepare a proper inlet opening for its filling (see chap.
07.4). Assemble the supplied fan where provided for (see point b). Later on, position the fireplace in the desired position. Once the fireplace
is positioned in the desired place, it is necessary to make sure that the fireplace is perfectly levelled. Adjust the feet height if necessary (see
point c).
Phase 2:
Connect the extensible aluminium pipe of the comburent air (already assembled on the comburent air inlet on the fireplace) to the
respective air inlet depending on the configuration type (see chap. 07.4
Phase 3:
Connect the chimney to the fireplace smoke exhaust (see chap. 07.1).
Phase 4:
Connect, depending on the configuration type, the extensible aluminium pipes to the fan hot air outlets (see chap. 07.4). In case of
hot air canalisation, for the forced fan model only, see chap. 07.5
Phase 5:
Assemble the internal panels and the smoke deflector (see point d).
Phase 6:
Make the electrical connections to the control unit (see chap. 07.6)
Place the control unit under the fireplace and near the fan, to make it accessible in case of maintenance operations. The display must be
positioned outside the coating.
Check the fan proper functioning before starting the fireplace.
Phase 7:
In case you want to open the vertical sliding door with the removable handle only, it is possible to remove the supplied handle by
unscrewing the screws under the same handle (see point e).
Phase 8:
Build the coating providing for the specific openings on the coating, depending on the configuration type (see chap. 07.4).
a) Humidifier kit assembly.
The humidifier may be connected both to the right and left. The following images show the humidifier assembly procedure on the left fireplace
side. The humidifier assembly procedure to the right is the same as the one to the left.
1 - Unscrew the two screws (1) to remove the metal sheet functioning as closure for the humidifier seat (2) (
F
ig
. 1);
2 - Position the humidifier (3) on its seat up to reaching the proper insertion. The humidifier must be inserted with steam outlets opening
towards the top (4). Screw the two screws previously unscrewed (
F
ig
. 2-3);
3 - Screw the flexible pipe of the humidifier filling nozzle (5) (
F
ig
. 4-5). The flexible pipe must be perfectly horizontal and the filling nozzle
must be levelled
After preparing the electrical connections and the air inlets depending on the configuration type (see chap. 07.4), perform the following
operations.
F
ig
. 1
1
2
F
ig
. 2
3
4
4
F
ig
1
F
ig
. 2
Proper position
Summary of Contents for AERJOLLY 80 EVO 12
Page 42: ...42 NOTES ...
Page 43: ...ENGLISH NOTES 43 ...