Receiving

Inspection

Remove any transit packing. Inspect the unit to ensure that all components have been delivered

according to the bill of lading and that all miscellaneous boxes or materials have been received.
Ensure that no damage to any portion of the chiller or loose items has occurred during transit.

If any damage is evident, it must be noted on the carrier’s freight bill and a claim entered in

accordance with the instructions given on the advice note.

Note: 

Johnson controls is not responsible for any damage in shipment or at job site or loss of

parts. Refer to 

Shipping Damage Claims Form, Form 50.15-NM

.

Delivery and storage

To ensure consistent quality and maximum reliability, all units are tested and inspected before

leaving the factory. Units are shipped completely assembled and containing refrigerant under

pressure. Units are shipped without export crating unless crating has been specified on the Sales

Order.
If the unit is to be put into storage, before installation, the following precautions must be observed:

The chiller must be blocked so that the base cannot sag or bow.

Ensure that all openings, such as water connections, are securely capped.

Do not store where exposed to ambient air temperatures exceeding 43.3°C (110°F).

The condensers must be covered to protect the coils and fins from potential damage and

corrosion, particularly where building work is in progress.

The unit must be stored in a location where there is minimal activity in order to limit the risk

of accidental physical damage.

To prevent inadvertent operation of the pressure relief devices, the unit must not be steam

cleaned.

Inspect the unit periodically during storage. Follow all directions for long term storage

requirements as defined in 

Form 50.20-NM7

.

The services of a qualified Johnson Controls Service representative is required for the installation

and startup of all YVAM model chillers installed in the continental United States.
Do not attempt to install or start the chiller without the presence of this qualified representative, as

this may void all or portions of the chiller warranty.

 CAUTION

The Johnson Controls warranty may be voided if the following restrictions are not adhered to.

Do not open valves or connections under any circumstances because such action will result in

loss of the factory refrigerant (Form 1) or nitrogen charge (Form 2).

Do not dismantle or open the chiller for any reason except under the supervision of a

Johnson Controls representative.

11

YVAM Air-Cooled Centrifugal Liquid Chiller

Summary of Contents for YORK YVAM

Page 1: ...28539 000 Form Number 160 88 N1 122 New Release Installation Guide Issue Date 2022 01 21 YVAM Air Cooled Centrifugal Liquid Chiller Field Installation Procedure for YVAM Units with 20 Fans HFC 134A 60...

Page 2: ...2 YVAM Air Cooled Centrifugal Liquid Chiller...

Page 3: ...ns 16 Roof locations 16 Seismic applications 16 Other considerations 17 Clearance requirements 17 Recommended clearances for all units 17 Rig chiller to final location 18 Leveling the chiller 19 Ancho...

Page 4: ...sulation 27 Unit heater operation verification 28 Reassembly 29 Refrigerant tubing reassembly 30 Assembly of straight thread O ring port fittings 30 Assembly of O ring face seal fittings 32 Dimensions...

Page 5: ...that these individuals possess independent training that will enable them to perform their assigned tasks properly and safely It is essential that prior to performing any task on this equipment this i...

Page 6: ...licable can be obtained by contacting the nearest Johnson Controls Service office or accessing the Johnson Controls Knowledge Exchange website at https docs johnsoncontrols com chillers It is the resp...

Page 7: ...Nomenclature Figure 1 System nomenclature Figure 2 Compressor nomenclature Figure 3 Vessel nomenclature 7 YVAM Air Cooled Centrifugal Liquid Chiller...

Page 8: ...Figure 4 Variable speed drive nomenclature YVAM Air Cooled Centrifugal Liquid Chiller 8...

Page 9: ...connections Chiller components See Figure 5 Figure 6 and Figure 7 for the major components of the YVAM chiller Figure 5 Control panel side view Callout Component Callout Component A Control panel B Si...

Page 10: ...pansion valve D Cooling piping for variable speed drive E Eaton surge suppressor F Direct drive motor and MBC G Compressor Figure 7 Variable speed drive end view Callout Component Callout Component A...

Page 11: ...capped Do not store where exposed to ambient air temperatures exceeding 43 3 C 110 F The condensers must be covered to protect the coils and fins from potential damage and corrosion particularly where...

Page 12: ...tem Do not run hot water 110 F or 43 3 C maximum or steam through the evaporator at any time Chiller data plate A unit data plate is mounted on the outside of the right side door of the Variable Speed...

Page 13: ...method to be used It is beyond the scope of this manual to specify rigging and lifting details Scope This procedure covers the rigging locating and final assembly of the YVAM units with total fan quan...

Page 14: ...the respective holes in the base frame Turn the lugs so that the spring loaded pin engages into the hole and the flanges on the lug lock behind the hole The lugs must be attached to the cables or chai...

Page 15: ...ent the chains from hitting the chiller and causing damage Never lift the chiller using a forklift or by hooking to the top rails Use only the lifting holes provided Lifting instructions are placed on...

Page 16: ...talled on a suitable flat and level concrete base that extends to fully support the two side channels of the unit base frame A one piece concrete slab with footings that extend below the frost line is...

Page 17: ...uneven unit airflow The results of the restricted airflow or hot air recirculation can diminish performance as outlined in Form 150 12 AD2 Air Cooled Chiller Derating Due to Airflow Restrictions John...

Page 18: ...acid rain is prevalent and when paired with adiabatic cooling solutions At installations where winter operation and snow accumulations are expected additional elevation must be provided to ensure nor...

Page 19: ...nts Anchor the chiller to the final location See the following mounting options before moving the chiller to its final location When spring isolators are used the unit must be supported in a safe mann...

Page 20: ...e recommended 1 Set the isolators on the floor housekeeping pad or subbase ensuring that all isolator centerlines match the equipment mounting holes 2 VMC Group recommends that the isolator base B be...

Page 21: ...g adjusting bolt E Non skid elastomeric pad F Lower housing G Upper housing H Positioning pin Figure 15 One inch deflection spring isolators Table 3 Spring isolator dimension data in Mount type W D L...

Page 22: ...are designed for 50 over travel See Installation of optional spring isolators for installation instructions Isolators with 1 in deflection must be of the same class for the entire unit That is C2Ps m...

Page 23: ...r rectangular in appearance Figure 17 Elastomeric isolator cross reference Type A isolators Table 6 Elastomeric isolator dimension data in mm Model P N L W HF AL AD BT CD DW Type A 029 25335 001 43400...

Page 24: ...tion while connecting and hanging the piping adjusting the connections and checking for correct alignment Compressor refrigerant piping and system external piping are factory installed on all units On...

Page 25: ...be cleaned or flushed before being connected to the chiller pumps or other equipment The evaporator must not be exposed to flushing velocities or debris released during flushing Install a suitably siz...

Page 26: ...ermanent strainers are required in the evaporator water circuit to protect the chiller and the pumps the chilled water air handler coils and controls and similar components The strainer must be instal...

Page 27: ...Field Control Modifications Manual Form 160 88 PW2 All wiring to the control panel is completed by the factory A control power transformer is factory furnished with the Variable Speed Drive Power wir...

Page 28: ...OM1 for the instructions to test each device WARNING All appropriate electrical safety measures must be followed when testing these heaters since these circuits will be energized CAUTION The evaporato...

Page 29: ...139 189 M30 M30 x 2 167 226 M33 M33 x 2 194 263 M42 M42 x 2 265 359 M48 M48 x 2 302 410 M60 M60 x 2 359 487 Table 9 Assembly torque values for SAE tube fittings Tube size SAE straight thread size O ri...

Page 30: ...d O ring ports have UN UNF or metric straight threads An elastomeric O ring is fitted to the male end During assembly the O ring is firmly sandwiched between the angular sealing surface of the female...

Page 31: ...amount but not more than one full turn More then one turn makes the locknut push the O ring into the machine threads beyond the fitting land area during Step 7 7 Use two wrenches to hold the fitting...

Page 32: ...hreads An elastomeric O ring is fitted into the grooved male end During assembly the O ring is firmly sandwiched between the sealing surfaces As a result sealing is affected and maintained by the O ri...

Page 33: ...nozzle arrangements and weights The following figure shows the detail of the evaporator 150 psi compact two pass waterboxes Figure 23 Two pass waterbox detail mm in 33 YVAM Air Cooled Centrifugal Liqu...

Page 34: ...ngements Two pass nozzle arrangements Three pass nozzle arrangements In Out In Out Lower rear side Upper rear side Lower rear side Upper front side Rear opposite VSD end Front VSD end Table 12 Two pas...

Page 35: ...4G microchannel 700 318 1680 762 Table 14 Waterbox weights Approximate evaporator and waterbox weights Evaporator Compact waterbox weights lb kg Code Weight lb kg One pass Two pass Three pass EB2514...

Page 36: ...ers mm Weight Pounds lb 0 4536 Kilograms kg Velocity Feet second fps 0 3048 Meters second m s Feet of water ft 2 989 Kilopascals kPa Pressure drop Pounds square inch psi 6 895 Kilopascals kPa Temperat...