VRF Air-Conditioner IOM
3
Figure 4
Figure 5
Air conditioner installation must meet the
national wiring rule standard.
Do not install the air conditioner in washhouse.
Air conditioner must be installed 2.3m above the
ground.
Air conditioner must be installed in a place
where the user is convenient to contact the plug.
6.
Drainage Hose Installation
Cautions:
Arrange the drainage hose below the piping.
Do not make drainage hose upheaved or curled.
Do not bind by pulling drainage hose.
Please use commercially available thermal
insulation material to wrap and bind when the
drainage hose passes through any room.
Wrap piping and drainage hose with felt strip
and stick on insulating pad at the position in
contact with wall surface.
Figure 6
6.1
Piping trend
Cut off "1" part on the indoor unit when the
piping comes out from right side. (Refer to Fig
7)
Cut off "2" part on the indoor unit when the
piping comes out from left side. (Refer to Fig 7)
Do not overexert when breaking off pipe in order
to avoid flat pipe.
Figure 7
7.
Installation of Indoor Unit
Let pipeline pass through wall hole and hang the
indoor unit on the mounting plate (clip the
indoor unit clip to the hook of the mounting
plate).
Figure 8
8.
Piping Connection
The bent pipe quantity of the indoor unit shall
not be more than 10, and that of the overall
Caution
Indoor connecting terminal
Connecting cable
Screw
Connecting cable
Indoor connecting terminal
Enlarged drawing of indoor connecting terminal
Cable pallet
Fixing screw
Electric box cover
Make sure core wire is fully inserted into
Insulating pad
Drainage hose
Liquid pipe
Gas pipe
Felt strip
Indoor unit
Clip
Mounting plate
Bottom surface of indoor unit