Johnson & Starley HI-SPEC J50 Installation, Commissioning & Servicing Instructions Download Page 22

11

22

mbar in.wg.
0.50

0.20

0.375 0.15

0.25

0.10

RESIST

ANCE EXTERNAL

 T

O HEA

TER

Response

Area

Table  5

Fan  Performance Curve

350

400

450

500

550

600 ft

3

/min

0.165

0.189

0.212

0.236

0.256

0.283 m

3

/sec

                    AIR VOLUME

Fig. 6a

Modairflow Circuit Diagram

6.8.4

Turn the gas supply ON at service cock.

6.8.5

Switch the appliance electrical supply OFF.

6.8.6

Disconnect the fan at the flying socket

6.8.7

Switch the appliance electrical supply ON.

6.8.8

Ignite the Main and Pilot Burners as detailed in sub para 6.3.1 to 6.3.5

6.8.9

Ensure that the Limit Switch operates, indicated by the Main Burner extinguishing, within 120 and 180 seconds.

6.8.10 Switch the appliance electrical supply OFF.

6.8.11 Reconnect the Air Heater Fan.

6.8.12 Switch the appliance electrical supply ON.

6.8.13 Ensure that the Main Burner re-ignites when the appliance temperature reduces, (note: with the fan disconnected, there

may be some delay before the Main Burner re-ignites).

7.

INSTRUCTIONS FOR USERS

7.1

If the building is unoccupied, ensure that the Instructions for the User are left taped to the air heater, and that the Installation,
Commissioning and Maintenance Instructions are left at or near the air heater for use on future service calls.

7.2

If the building is occupied, hand the User Instructions over and ensure the User understands:

7.2.1

How to ignite the Pilot  and Main Burners.

7.2.2

How to operate the Thermista-stat/room thermostat, time and heater ON/OFF switch and summer air circulation switch,
and that the time control must be reset following a power failure.

7.2.3

How to extinguish the Pilot and Main Burner at the Multifunctional Control, and switch off the electrical supply to the
heater.

7.2.4

How to remove, clean and refit the air filter and at what intervals (i.e. fortnightly, or weekly for new houses.)

7.2.5

How to control the heating system by opening and closing warm air outlets.

7.2.6

How to obtain summer air circulation.

7.2.7

That the air grilles on the heater or heater compartment; grilles and ventilators in the walls, windows or doors of the
building must not be obstructed.

7.2.8

That the heater must be serviced at least once a year by a competent person to ensure efficient and safe operation.

7.2.9

That the red instructions for safe use have been pointed out and understood.

7.2.10 That expert help must be obtained if persistent failure of the pilot burner occurs.

Summary of Contents for HI-SPEC J50

Page 1: ...t is 3 32kW 11 5MJ h 11 340Btu h THISAPPLIANCECONFORMSTOBSEN45014 Installation shall be in accordance with the current editions of Building Standards Scotland Consolidation Regulations Building Regulations Gas Safety Installation and Use Regulations as amended BS 7671 Institute of Electrical Engineers I E E Wiring Regulations BS 6891 Installation of Low Pressure Gas Pipework of up to 28mm R1 in do...

Page 2: ...compartment must comply with the relevant section of BS 5864 Side and rear clearances should be not less than 25mm 1in Important Ensure that the rear of the heater is at no time subjected to air pressure subject to leaks from underfloor joists or roof spaces 2 7 In freestanding installations see instructions packed with Top Closure Kit TCS50 only one or two walls will be in close proximity to the ...

Page 3: ...work including riser ducts should be fully insulated with 50mm 2in fibreglass or similar If short extended duct runs are taken below floor level these should be similarly insulated and in addition wrapped with a sound vapour proof barrier and protected from crushing 4 2 2 The duct system should be carefully designed to suit the needs of its specific heating requirements and building layout The typ...

Page 4: ... achieved practicably by some means Where this is not practicable the existing flue system may be used providing there is no evidence of spillage from the old appliance see 5 1 9 above Every effort must be made however to ensure that the existing flue complies in every other way to BS 5440 Part 1 including the visual inspection flue flow and spillage test described in 4 3 2 of the above standard F...

Page 5: ... RECORD Burner operating pressure Mbar Heat input KW Water flow temperature o C FOR ALL PRODUCTS Does the heating hot water system comply with the appropriate building regulations YES NO Has the appliance and associated controls been installed commissioned in accordance with manufacturer s instructions YES NO Have you demonstrated the operation of the appliance system controls to the customer YES ...

Page 6: ...986 1000 0000040 Timecontrolcover 1 5 384 739 BOS00105 Overheat limitControl 1 Honeywell L4069C 6 393 412 BOS01301 Multifunctionalcontrol 1 Honeywell V8600C 7 232 903 BOS02061 Sealing ring for item 6 2 8 244 880 BOS02397 4 Pilot assembly 1 9 392 935 1000 0705140 Pilot Injector 1 10 E02 418 1000 0705260 Pilot Feed Pipe 1 11 386 820 1000 0703870 Thermocouple 1 12 386 775 BOS01970 Electrode 1 13 397 ...

Page 7: ...sible When this is not possible the pipe must be capable of taking the complete input of the heater and all other gas appliances being served by this same pipe This supply should be suitably sized to conform to British Standards requirements of no more than 1 0 mbar 0 4in wg pressure drop See table of discharge in BS 6891 5 3 2 The 1 2 in union gas cock supplied must be fitted to the gas inlet of ...

Page 8: ... rooms i e bathrooms etc Outlet faces may require partial blanking in order to achieve this 6 2 4 Set the SUMMERAIR CIRCULATION switch to OFF 6 3 IGNITIONOFPILOTANDMAINBURNERS WARNING If the Pilot Burner is extinguished either intentionally or unintentionally no attempt should be made to relight the gas for a minimum of 3 minutes Ensure that the Electrical supply Time Control and Selector switches...

Page 9: ...ers fan speed is adjusted by selecting the fan speed at the control panel decrease voltage selection to decrease fan speed 6 3 6 Ensure that the pilot flame envelops the thermocouple tip adjusting the Pilot Adjuster as required Refer Figs 4 and 5 6 3 7 Set the Heater Electricity supply ON 6 3 8 Set the Time Control to the required Heating On periods 6 3 9 Set the Selector switch to TIMED 6 3 10 Se...

Page 10: ...xtractor fans in operation NOTE If an extractor fan is situated in an adjoining or adjacent room carry out the spillage test with the interconnecting doors open If the draught diverter is accessible a Introduce smoke into the draught diverter adjacent to an exit from the heat exchanger by means a smoke match or puffer b Ensure that there is no spillage present indicated by displacement of smoke do...

Page 11: ...the Installation Commissioning and Maintenance Instructions are left at or near the air heater for use on future service calls 7 2 If the building is occupied hand the User Instructions over and ensure the User understands 7 2 1 How to ignite the Pilot and Main Burners 7 2 2 How to operate the Thermista stat room thermostat time and heater ON OFF switch and summer air circulation switch and that t...

Page 12: ...y and air filter air cleaner 8 1 11 Light the appliance and note the main burner flame profile If the flame profile is affected when theAir Circulation fan switches on check for any air leaks between the air heater and the base plenum paying particular attention to heaters with rear draught diverters Rectify any air leaks before continuing with this procedure 8 1 12 Allow the air heater to operate...

Page 13: ...ROLREMOVAL 8 6 1 Remove the Burner and Control Assembly as detailed in 8 2 8 6 2 Disconnect the Thermocouple at the Multifunctional Control including the adapter avoiding damage to the capillary 8 6 3 Disconnect the Pilot Feed Pipe from the Multifunctional Control 8 6 4 Disconnect the Multifunctional Control input and output supply feeds 8 6 5 Refitting or replacement is in reverse order 8 7 PIEZO...

Page 14: ...OVAL MODAIRFLOWMODELSONLY 8 10 1 Remove the ElectricalAssembly as detailed in sect 8 9 8 10 2 Disconnect the Electronic Module from the ElectricalAssembly 8 10 3 Release 3 x screws securing the Electronic Module to the Electrical Mssembly and remove the module 8 10 4 Refitting or replacement is in reverse order 8 11 TRANSFORMERREMOVAL MODAIRFLOWMODELSONLY 8 11 1 Remove the ElectricalAssembly as de...

Page 15: ...ut with a multimeter On completion of any maintenance fault finding task that has required the breaking and remaking of electrical connections then checks of continuity polarity and resistance to earth must be repeated 9 2 WARNINGS 9 2 1 When purging or checking gas supplies ensure that ventilation to the room or cupboard is adequate and that all naked lights are extinguished 9 2 2 MODAIRFLOW mode...

Page 16: ...itch replace if necessary Fittemporaryloopinheaterthermostatsocket Ifheaterignitescheckexternalcircuit Possible Cause 1 No gas to the heater 2 Gas supply not purged 3 Pilot orifice restricted 4 Piezo system faulty 5 Excessive gas supply pressure 1 Connection between thermocouple and mutifunctional control not secure 2 Faulty power unit multifunctional control 3 Faulty thermocouple 1 No voltage to ...

Page 17: ...itch replace if necessary Fittemporaryloopinheaterthermostatsocket Ifheaterignitescheckexternalcircuit Possible Cause 1 No gas to the heater 2 Gas supply not purged 3 Pilot orifice restricted 4 Piezo system faulty 5 Excessive gas supply pressure 1 Connection between thermocouple and mutifunctional control not secure 2 Faulty power unit multifunctional control 3 Faulty thermocouple 1 No voltage to ...

Page 18: ...ut with a multimeter On completion of any maintenance fault finding task that has required the breaking and remaking of electrical connections then checks of continuity polarity and resistance to earth must be repeated 9 2 WARNINGS 9 2 1 When purging or checking gas supplies ensure that ventilation to the room or cupboard is adequate and that all naked lights are extinguished 9 2 2 MODAIRFLOW mode...

Page 19: ...OVAL MODAIRFLOWMODELSONLY 8 10 1 Remove the ElectricalAssembly as detailed in sect 8 9 8 10 2 Disconnect the Electronic Module from the ElectricalAssembly 8 10 3 Release 3 x screws securing the Electronic Module to the Electrical Mssembly and remove the module 8 10 4 Refitting or replacement is in reverse order 8 11 TRANSFORMERREMOVAL MODAIRFLOWMODELSONLY 8 11 1 Remove the ElectricalAssembly as de...

Page 20: ...ROLREMOVAL 8 6 1 Remove the Burner and Control Assembly as detailed in 8 2 8 6 2 Disconnect the Thermocouple at the Multifunctional Control including the adapter avoiding damage to the capillary 8 6 3 Disconnect the Pilot Feed Pipe from the Multifunctional Control 8 6 4 Disconnect the Multifunctional Control input and output supply feeds 8 6 5 Refitting or replacement is in reverse order 8 7 PIEZO...

Page 21: ...y and air filter air cleaner 8 1 11 Light the appliance and note the main burner flame profile If the flame profile is affected when theAir Circulation fan switches on check for any air leaks between the air heater and the base plenum paying particular attention to heaters with rear draught diverters Rectify any air leaks before continuing with this procedure 8 1 12 Allow the air heater to operate...

Page 22: ...the Installation Commissioning and Maintenance Instructions are left at or near the air heater for use on future service calls 7 2 If the building is occupied hand the User Instructions over and ensure the User understands 7 2 1 How to ignite the Pilot and Main Burners 7 2 2 How to operate the Thermista stat room thermostat time and heater ON OFF switch and summer air circulation switch and that t...

Page 23: ...xtractor fans in operation NOTE If an extractor fan is situated in an adjoining or adjacent room carry out the spillage test with the interconnecting doors open If the draught diverter is accessible a Introduce smoke into the draught diverter adjacent to an exit from the heat exchanger by means a smoke match or puffer b Ensure that there is no spillage present indicated by displacement of smoke do...

Page 24: ...ers fan speed is adjusted by selecting the fan speed at the control panel decrease voltage selection to decrease fan speed 6 3 6 Ensure that the pilot flame envelops the thermocouple tip adjusting the Pilot Adjuster as required Refer Figs 4 and 5 6 3 7 Set the Heater Electricity supply ON 6 3 8 Set the Time Control to the required Heating On periods 6 3 9 Set the Selector switch to TIMED 6 3 10 Se...

Page 25: ... rooms i e bathrooms etc Outlet faces may require partial blanking in order to achieve this 6 2 4 Set the SUMMERAIR CIRCULATION switch to OFF 6 3 IGNITIONOFPILOTANDMAINBURNERS WARNING If the Pilot Burner is extinguished either intentionally or unintentionally no attempt should be made to relight the gas for a minimum of 3 minutes Ensure that the Electrical supply Time Control and Selector switches...

Page 26: ...sible When this is not possible the pipe must be capable of taking the complete input of the heater and all other gas appliances being served by this same pipe This supply should be suitably sized to conform to British Standards requirements of no more than 1 0 mbar 0 4in wg pressure drop See table of discharge in BS 6891 5 3 2 The 1 2 in union gas cock supplied must be fitted to the gas inlet of ...

Page 27: ...986 1000 0000040 Timecontrolcover 1 5 384 739 BOS00105 Overheat limitControl 1 Honeywell L4069C 6 393 412 BOS01301 Multifunctionalcontrol 1 Honeywell V8600C 7 232 903 BOS02061 Sealing ring for item 6 2 8 244 880 BOS02397 4 Pilot assembly 1 9 392 935 1000 0705140 Pilot Injector 1 10 E02 418 1000 0705260 Pilot Feed Pipe 1 11 386 820 1000 0703870 Thermocouple 1 12 386 775 BOS01970 Electrode 1 13 397 ...

Page 28: ... RECORD Burner operating pressure Mbar Heat input KW Water flow temperature o C FOR ALL PRODUCTS Does the heating hot water system comply with the appropriate building regulations YES NO Has the appliance and associated controls been installed commissioned in accordance with manufacturer s instructions YES NO Have you demonstrated the operation of the appliance system controls to the customer YES ...

Page 29: ... achieved practicably by some means Where this is not practicable the existing flue system may be used providing there is no evidence of spillage from the old appliance see 5 1 9 above Every effort must be made however to ensure that the existing flue complies in every other way to BS 5440 Part 1 including the visual inspection flue flow and spillage test described in 4 3 2 of the above standard F...

Page 30: ...work including riser ducts should be fully insulated with 50mm 2in fibreglass or similar If short extended duct runs are taken below floor level these should be similarly insulated and in addition wrapped with a sound vapour proof barrier and protected from crushing 4 2 2 The duct system should be carefully designed to suit the needs of its specific heating requirements and building layout The typ...

Page 31: ...compartment must comply with the relevant section of BS 5864 Side and rear clearances should be not less than 25mm 1in Important Ensure that the rear of the heater is at no time subjected to air pressure subject to leaks from underfloor joists or roof spaces 2 7 In freestanding installations see instructions packed with Top Closure Kit TCS50 only one or two walls will be in close proximity to the ...

Page 32: ...t is 3 32kW 11 5MJ h 11 340Btu h THISAPPLIANCECONFORMSTOBSEN45014 Installation shall be in accordance with the current editions of Building Standards Scotland Consolidation Regulations Building Regulations Gas Safety Installation and Use Regulations as amended BS 7671 Institute of Electrical Engineers I E E Wiring Regulations BS 6891 Installation of Low Pressure Gas Pipework of up to 28mm R1 in do...

Reviews: