- 10 -
User Guide
JVC85BCT
S Y M B O L S O N C O N T R O L PA N E L
Main power switch
Speed control
Brush motor switch
Brush motor switch
M A C H I N E I N S TA L L AT I O N
UNPACK THE MACHINE
1. Check the packing case for breakage, if any, report to the freight agent immediately.
2. Check the freight list for missing parts, components or package, if any, contact the distributor.
Freight List:
• 2-12V batteries --optional
• 220V, 15A intelligent charger
•
8 connecting cable, 37 cm
• 4 rubber covers for battery connection
• 1 set of squeegee assembly
• 2 brushes and 2 pad holder
• cleaning pad should otherwise purchase
3. Remove the steel fixed block before unpacking the machine. Unload the machine off the rack carefully
with the assistance of other personnel.
NOTE:
Do not push the machine directly without using the cargo handling apron in case of damages.
NOTE:
To avoid damages to the machine, fix the batteries after the machine is unloaded from the rack.