NOTE:
If this required 10 foot (3 m) distance to a parapet,
vertical wall or structure cannot be maintained, standard
terminations must be used. See Vertical Termination
Installation on page 24.
5. When installing a concentric termination through a sidewall;
ensure that all exterior sidewall clearance requirements for
the termination, shown in Figure 52 on page 37, are being
maintained. These clearances and those cited by local and
national codes must be maintained.
6. When installing multiple concentric terminations vertically
through a roof or horizontally through a sidewall ensure the
required clearances between terminations and groupings of
multiple terminations are maintained. See pages 31 and
32 for more information.
7. Cut a 5 inch (13 cm) diameter hole for the 4 inch concentric
termination where the termination will pass through the wall or roof.
NOTE:
Beware of concealed wiring and piping when cutting
through the wall or roof.
8. When installing multiple concentric terminations vertically
through the roof in the same location the termination caps
for all concentric terminations must be at the same height
measured from ground. See Multiple Concentric Termination
Arrangements on page 32.
9. Determine if the concentric termination will need to be
shortened to accommodate required clearances or to ensure
all vent caps are at the same height when installing multiple
terminations vertically through the roof in the same location.
See Figure 28 on page 30 for the minimum lengths allowed
for the 4 inch concentric termination.
Use only SDR-26 pipe to extend the 4 inch concentric
termination.
NOTE:
When shortening the length of the termination
carefully measure and cut the larger (intake air) pipe first.
Cut the same amount of pipe off of the smaller (vent) pipe.
NOTE:
Lengthening of the Concentric Vent Termination is
not permitted.
10. Proceed to 4 Inch Concentric Termination Installation on
page 30.
CONCENTRIC TERMINATION INSTALLATION
1. Concentric terminations must be ordered separately. (A)
JWSH100150 thru (A)JWSH100250 models must use the
4 inch concentric termination; Part Number: 9006328005.
Contact your local distributor or call the parts department
phone number on the back cover of this manual to order
concentric terminations.
2. Determine the location for the termination.
NOTE:
Roof termination is preferred since it is less susceptible
to damage, has reduced chances to intake contaminants and
vent vapors are less visible.
3. When installing a concentric termination vertically through the
roof; ensure that all exterior vertical clearance requirements
for the concentric termination, shown in Figure 29 on page
30 are being maintained. These clearances and those
cited by local and national codes must be maintained.
4. When installing a concentric termination vertically through a
flat roof, the termination's vent cap must be a minimum of 10
feet (3 m) away from any parapet, vertical wall or structure as
shown in Figure 27.
CONCENTRIC TERMINATION(S)
MUST BE A MINIMUM OF 10 FEET
(3 m) AWAY FROM ANY PARAPET,
VERTICAL WALL OR
STRUCTURE.
CONCENTRIC TERMINATION
FLAT ROOF CLEARANCE
Figure 27