The calibration will run – you will see a countdown on the screen which is
equivalent to 100 meters of travel at 10km/h.
When the calibration stops, weigh the grain you collected and enter the
amount on the screen with how many rows it was collected from.
There is an expected weight shown on the screen with a rough guide to
how much you can expect, but the actual value can vary quite a lot.
Make
sure that the weight is entered in the correct units after the number of
rows has been selected.
Section 4 – Seeding/Operation:
Step 1)
Go to the “Start Seeder” screen – note: when the machine is lifted
out of the ground you will see a warning on the screen saying “Tyne Up!”
(See below). When you lower the machine into the ground, this warning
will disappear and sowing can commence. Ensure the hopper is filled with
the calibrated products.
Step 2)
Press the “Start” button on the screen to start sowing. The display
will show the distance covered in hectares and the amount of product that
has been distributed for each bin in the current run. Seeding will
automatically stop when the machine stops (or drops below 3km/h) to
conserve product. You can also use the up and down arrows to adjust the
rate on the go (in 1kg/ha increments). There is a pause button for each bin
to pause only that bin (if you only want to sow seed from Bin 1 for
example)
Enter how much is
collected here
using the keypad
below. If entering
less than 1, include
the 0 before the
decimal point.
Press next to enter
how many rows it
was collected from
Countdow
n timer
Settings
being
calibrated
Summary of Contents for Pasture Renovation Drill
Page 1: ...Pasture Renovation Drill Operators Manual 143J1...
Page 4: ......
Page 6: ......
Page 8: ...02 19M143J1...
Page 20: ...12...
Page 21: ...02 19M143J1 13 NOTES...
Page 32: ...02 19M143J1 24...
Page 35: ...02 19M143J1 27 580 TYNE LAYOUT 2 8m...
Page 36: ...02 19M143J1 28 COIL TYNE LAYOUT 2 4m...
Page 37: ...02 19M143J1 29 DISC LAYOUT...
Page 38: ...30 MAIN FRAME GRAIN AND FERTILIZER BOX PLATFORM ETC...
Page 40: ...02 19M143J1 32...
Page 42: ...02 19M143J1 34 ELECTRIC DRIVE COMPONENTS...
Page 44: ...02 19M143J1 36 VARIDRIVE GEARBOX...
Page 46: ...02 19M143J1 38...
Page 48: ...02 19M143J1 40...
Page 50: ...02 19M143J1 42 DISC ASSEMBLY...
Page 52: ...02 19M143J1 44...