02.19M143J1
10
LUBRICATION
Item
Operation
Schedule
Wheel Hub
Grease
200hrs
Axle Rockshafts
Grease
Daily / 10hrs
Clutch
Grease
Daily / 10hrs
Tynes
Grease
Daily / 10hrs
Distributor shafts
Grease
50hrs
Trimming Screw
Grease
Annually
Varidrive Gearbox
Check for leaks (topup if
necessary-
SAE
50W/40
Motor
Oil)
Annually
Tyres
Check Pressure
Daily
Chains
Check adjustment
Daily
Chains
Annual Maintenance – thorough
check and re-grease
Annually
General Inspection
(Nut & Bolts)
Check for tightness
Daily
Hopper
Clean out at end of each day
(Particularly Hydroscopic
Fertilizer)
Daily
Grease Nipples
Lubricate all prior to storage at
the end of each working period
Seasonally
DO NOT LEAVE FERTILISER IN THE IMPLEMENT
OVERNIGHT. (PARTICULARY HYGROSCOPIC FERTILISER,
WHICH WILL TAKE UP MOISTURE AND HARDEN)
TYRE PRESSURES
TYRE PRESSURES ARE IMPORTANT
OVER INFLATION will impair flotation -
Increasing sowing depth variations as ground conditions vary.
UNDER INFLATION can result in tyre failures.
TYRE
Pasture Renovation Drill
SIZE
2.0
2.4
2.8
3.3
Tyne Disc Tyne Disc Tyne Disc Tyne Disc
235/75 R15
TYRE
PRESSURE
kPa
250
275
280
300
psi
36
40
41
44
215/85 R16
TYRE
PRESSURE
kPa
450
480
525
560
psi
65
70
76
81
SPEED LIMIT 25km/h (10km/h SOWING)
Summary of Contents for Pasture Renovation Drill
Page 1: ...Pasture Renovation Drill Operators Manual 143J1...
Page 4: ......
Page 6: ......
Page 8: ...02 19M143J1...
Page 20: ...12...
Page 21: ...02 19M143J1 13 NOTES...
Page 32: ...02 19M143J1 24...
Page 35: ...02 19M143J1 27 580 TYNE LAYOUT 2 8m...
Page 36: ...02 19M143J1 28 COIL TYNE LAYOUT 2 4m...
Page 37: ...02 19M143J1 29 DISC LAYOUT...
Page 38: ...30 MAIN FRAME GRAIN AND FERTILIZER BOX PLATFORM ETC...
Page 40: ...02 19M143J1 32...
Page 42: ...02 19M143J1 34 ELECTRIC DRIVE COMPONENTS...
Page 44: ...02 19M143J1 36 VARIDRIVE GEARBOX...
Page 46: ...02 19M143J1 38...
Page 48: ...02 19M143J1 40...
Page 50: ...02 19M143J1 42 DISC ASSEMBLY...
Page 52: ...02 19M143J1 44...