02.19M143J1
14
Setup and Operation
The John Shearer App on the tablet will step you through the setup. Here is a guide to how it works:
Section 1 - Machine Setup
Step1) press “Configure Machine”
Step 2) enter the number of rows on the machine
Step 3) enter the sowing width of the machine in metres.
Section 2 - Wheel Calibration:
In order to get an accurate measurement of distance and therefore an
accurate rate, it is necessary to perform a wheel calibration. This should be
performed before the first use of the machine or if a change is made to the
wheels on the machine (such as a change in the size of wheels and/or
tyres). It is
not
necessary to do this every time the machine is used.
In this process you will need to tow the machine a set number of sensor
pulses which will be shown on screen. It is recommended that you perform
this test at roughly the same speed as you would normally sow (typically
around 8km/h), although it is best to slow down towards the end of the
count down, in order to stop accurately at a sensor pulse.
Summary of Contents for Pasture Renovation Drill
Page 1: ...Pasture Renovation Drill Operators Manual 143J1...
Page 4: ......
Page 6: ......
Page 8: ...02 19M143J1...
Page 20: ...12...
Page 21: ...02 19M143J1 13 NOTES...
Page 32: ...02 19M143J1 24...
Page 35: ...02 19M143J1 27 580 TYNE LAYOUT 2 8m...
Page 36: ...02 19M143J1 28 COIL TYNE LAYOUT 2 4m...
Page 37: ...02 19M143J1 29 DISC LAYOUT...
Page 38: ...30 MAIN FRAME GRAIN AND FERTILIZER BOX PLATFORM ETC...
Page 40: ...02 19M143J1 32...
Page 42: ...02 19M143J1 34 ELECTRIC DRIVE COMPONENTS...
Page 44: ...02 19M143J1 36 VARIDRIVE GEARBOX...
Page 46: ...02 19M143J1 38...
Page 48: ...02 19M143J1 40...
Page 50: ...02 19M143J1 42 DISC ASSEMBLY...
Page 52: ...02 19M143J1 44...