26 of 76
7.5 CABLE TO TOWER INSTALLATION
1. Assemble each cable to the top plate of their respective towers. Secure in place
with 7/8" washer and two 7/8" hex nuts. See
Figure 17
.
Note: During leveling of the lift (see
Section 6.11
), optional 1" and 2" spacers
have been included to allow for more adjustment.
Figure 17. Cable routing diagram
Summary of Contents for ALIGNMENT 44218Q
Page 8: ...8 of 76 SAVE THESE INSTRUCTIONS 2 1 SAFETY WARNING LABELS SAVE THESE INSTRUCTIONS ...
Page 13: ...13 of 76 6 1 TYPICAL BAY LAYOUT ...
Page 15: ...15 of 76 Figure 3 Chalk line layout ...
Page 44: ...44 of 76 10 2 MAINTENANCE RECORDS Maintenance and Training Performed Date By Notes ...
Page 57: ...57 of 76 12 0 PARTS LIST 12 1 LIFT ASSEMBLY ...
Page 59: ...59 of 76 12 3 TOWER ASSEMBLY ...
Page 61: ...61 of 76 12 5 DECK ASSEMBLY LEFT SIDE ...
Page 63: ...63 of 76 12 7 CROSSMEMBER ASSEMBLY ...
Page 65: ...65 of 76 12 9 CYLINDER ASSEMBLY ...
Page 67: ...67 of 76 12 11 HYDRAULIC AND AIR KIT ...
Page 70: ...70 of 76 12 14CABLE ROUTING ...