21 of 40
6.11
COVERS, WHEEL STOPS AND APPROACH RAMPS
1.
Locate and install the center cover over the mechanical safety release connecting rod and
center connecting hydraulic line. Install using the four (4) ¼" - 20 UNC x ¾" long hex head
bolts, flat washers and lock washers.
2.
Check to make sure that the safety release connecting rod does not bind during operation.
3.
Locate and install protective line covers over all air and hydraulic supply lines.
4.
Using a rotary hammer drill and a ¼" concrete drill bit, drill all line cover locations. Using
the ¼" nail-in anchors supplied, fasten the line covers to the floor.
5.
Locate and install the two (2) front wheel stops; one (1) to the front of each of the runways
using the six (6) 1/2" - 13 UNC x 1 1/2" long hex head bolts, flat washers, and lock washers.
6.
Install the approach ramps using ramp pins, washers, and cotter pins.
Summary of Contents for 48109B
Page 12: ...12 of 40 Hydraulic Schematic ...
Page 28: ...28 of 40 11 PARTS MANUAL 11 1 BAYSAVER ASSEMBLY ...
Page 31: ...31 of 40 11 3 BAYSAVER HYDRAULICS ...
Page 33: ...33 of 40 11 5 BAYSAVER OPTIONS ...
Page 35: ...35 of 40 11 7 BAYSAVER CONSOLE ...
Page 37: ...37 of 40 11 9 9000 LB BAYSAVER POWERPACK ...
Page 39: ...39 of 40 11 12 12 000 LB BAYSAVER POWER PACK PARTS LIST ...