Vision
Es-Plus
//
Vending
MNP141GBV00 Date: 2011/04/29 Rev. 0 PAGE 19 OF 24
- This process is divided in two parts, the first is erasing the flash memory and the
second is the program recording.
7.-
When the recording program has finished communicating with the machine, a new
window will appear showing the result of the process.
(For more information, consult the manual of the EASYFLASH reprogramming device)
6.
Operation
For the correct operation of the ES-Plus slave machine, it must be connected to a
MASTER machine or to an external payment module with the appropriate software to
control this type of slave machine. Once the MASTER machine communicates with the
slave machine, the MASTER machine or MASTER module software will determine how
the slave machine is to function (extraction, self -tests, manual handling etc.).
7.
Troubleshooting
The following table will help you solve the most common machine failures. It describes a
series of anomalies, their possible causes and the steps to take in solving them or in
determining the cause of such failures before contacting our customer service.
FAULT
CAUSE
SOLUTION
? The MASTER machine or
MASTER module does not
detect the slave machine.
? Incorrect wiring
connection between them.
? Check the connection
cable between the two
machines and the internal
connections of the cable
with the control card of the
slave machine.
? No sales are made from
any channel in the machine.
? Machine out of service
because of elevator break
down, product detection
system fault or because
there is no motor
connected.
? Check the fault in the
MASTER machine
checking address.
? Should there be a fault in
the elevator due to a jam,
remove it and reset the
fault in the relevant address
of the MASTER machine.
? If the lift motor does not
move properly check if it is
getting power when you try
to move it via the manual
handling address of the
MASTER machine. If there
is no power supply, check
the wiring and control card.
Otherwise, replace the