![Joerns WeCare Bed User & Service Manual Download Page 10](http://html1.mh-extra.com/html/joerns/wecare-bed/wecare-bed_user-and-service-manual_2021335010.webp)
10
Joerns® Bed Frames
WeCare™ Bed
© 2022 Joerns Healthcare • 6110435 RevC • 22-2083
For models with staff control in foot panel - cable
install and routing:
1. Raise the bed to a comfortable working height
and raise the foot section with the pendant. Then
unplug the bed.
2.
Locate the two staff control cables. Lay them out
side by side with one cable reversed. A male and
female connection should be at each end.
3. Unplug the pendant. Route one cable under the
control box and plug into pendant port. Route the
second cable under the control box and connect to
the hand pendant (Figure 22).
4. Route the two cables under the main frame toward
the foot end. Zip tie the two cable ends on top of
the foot end cross tube (Figure 23).
5.
Route cables tightly under the main frame tube.
Gather and bundle the excess cables nearest the
next cross tube and away from the leg mechanism
(Figure 24).
6.
Zip tie as shown by arrows (Figure 25).
Figure 24
ARP NOTE: Need high res
image from Gary’s PPT.
Figure 22
Figure 23
Figure 25