pag. 65
INSTALLING THE BURNER ONTO THE BOILER
Secure the flange 2 the boiler by no. 4 screws 3 by interposing the insulating gasket 4 and the eventual insulating cord 5.
Insert the burner in the flange so that the nozzle enters the combustion chamber according to the indicators of the boiler
manufacturer. Tighten the screw 1 to block the burner.
The dimensions are indicative. They may be influenced
by:
Excess of air
The shape of the combustion chamber;
Development of smoke turns of the boiler
(direct/overturning);
Pressure in the combustion chamber.
FLAME DIMENSIONS
1
4
3
2 5
10
20
30
40
50
60
70
80
90
0
200
400
800
600
100
cm
180 200 220 240
120 140 160
100
80
60
40
Flame Diameter
Flame Length
Mcal/h
D = 50
D = 60
flame
test pipeline
218 M cal
115 cm
667 M cal
200 cm
GB
Summary of Contents for G50/2 oil
Page 5: ...pag 4 ALLEGATO DI DICHIARAZIONE ALLA CONFORMIT...
Page 25: ...pag 24 G 50 2 oil G 70 2 oil...
Page 33: ...pag 32 ANNEXE A LA DECLARATION DE CONFORMITE...
Page 53: ...pag 52 G 50 2 oil G 70 2 oil...
Page 61: ...pag 60 ANNEX TO THE CONFORMITY DECLARATION...
Page 81: ...pag 80 G 50 2 oil G 70 2 oil...
Page 89: ...p g 88 ANEXO A LA DECLARACI N DE CONFORMIDAD...
Page 109: ...p g 108 G 50 2 oil G 70 2 oil...
Page 117: ...ANEXO DE DECLARA O CONFORMIDADE p g 116...
Page 137: ...p g 136 G 50 2 oil G 70 2 oil...
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ...PA INO 0 1 2 3 4 5 6 7 8 9 T N Ph...
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......