5.2 Inverter first commission
Choose suitable weather, with enough sunshine, and
make sure the normal operation of your solar pumping
system. Try to ensure that inverter work under high output
power, high output frequency as much as possible. Please
make sure the following condition before commissioning.
●
Ensure that the inverter is connected correctly to the
AC motor.
●
Ensure that the polarity of PV arrays is correct.
●
Ensure that ac inputs R, S and ground connections
are correct.
●
Check whether the system pipeline is unobstructed or
not;
●
Switch on the DC-side circuit breakers.
After finishing the above steps, then begin initialization.
Auto model:
● Inverter default setting is Auto model, when inverter
power on, Inverter power indicator light will be on, inverter
will auto operate, POWER and RUN light will be on,
inverter start to work.
Summary of Contents for JNP370LS-V1
Page 1: ...I Quick Installation JNP370LS V1 JNP550LS V1 QI JNP 550LS V1 EN V1 0 Solar pumping inverter ...
Page 19: ...16 Figure 3 11 detail of water level sensor A Figure 3 10 detail of water level sensor A ...
Page 32: ...29 automatic ally restart only if recharged hardware damage inverter inside hardware damage ...