18
4.Commissioning
4.1 Electrical Connection Inspection before Commissioning
Before commissioning, electrical connection inspection should be done strictly
,
to ensure safety of the inverter & controller as well as the personal safety; To prevent
accidents, specific inspection items as follows:
(
1
)
Check whether the PV open circuit voltage is within the allowable voltage range
of the inverter & controller;
(
2
)
Check if the PV positive and negative poles are correct;
(
3
)
Checking AC input connection is firm or not;
(
4
)
Checking whether the battery voltage is within the allowable range of the
inverter & controller;
(
5
)
Checking the negative and positive pole of battery be right;
(
6
)
Checking AC output side is firm and correct ;
(
7
)
Checking control interface is firm and correct.
4.2 Charging Commissioning
4.2.1 PV Charging Commissioning
Please ensure that commissioning is doing in sunny condition, specific operation
steps as follows:
Step 1
: Turn on air-switch of battery pack;
Step 2
: Turn on air-switch of PV input side, waiting about one minute, check the LCD
indicator light lighten or not, then check the LCD display status, shown as follows:
Figure 4-1 PV Charging LCD Diagram
Step 3
: LCD display PV charging status is normal, turn off the PV input side
air-switch, finish PV charging
commissioning.
Upv
79.3V
12.6A
Ipvchg
ON/OFF