12
Step 1
: Please
according to follow methods, making Grid power side cable connection
and connectors.
Figure 3-7 Grid Power Side Connectors Making and Cable Connecting Diagram
Step 2
: When finished above inspections, keep AC side air-switch in off state, insert
grid power side’s cables into air-switch according to L1 (fire wire), L2( fire wire) and
N (zero wire) separately.
Step 3
: Then insert cables which were made in Step 2 into AC air-switch accordingly.
Grid input side cable connecting diagram as follows:
Figure 3-8 Grid Input Side Cable Connecting Diagram
3.4.2.2 Diesel Generator Connection
Please ensure inverter & controller in power off state.
Step 1
: Refer to diesel generator’s user manual, to find its start mode is NO (normally
open) or NC ( normally close) .
1.Use wire stripping pliers to
strip 10mm,then use Crimping
Pliers to press terminal.
3.Use cross opener to tighten screw,then
cover and tighten protective cover,finish
power grid terminal connection.
2.Insert pressed cable into protective
cover.
10mm
Grid Input
Terminal
L1
N
Grid
L2