• When lifting machine, it is very important that the lifting device and equipment is
attached only to designated lifting points.
• Make adjustments to the lifting device and equipment to ensure the machine will be
level when elevated. The machine must remain level at all times while being lifted.
• Ensure that the lifting device and equipment is adequately rated and suitable for the
intended purpose. See Section 9
Specifications for machine weight or weigh
machine.
• Remove all loose items from machine prior to lifting.
• Lift machine with smooth, even motion. Set machine down gently. Avoid quick or
sudden motions that could cause shock loads to machine and/or lifting devices.
Summary of Contents for Skytrak 3013
Page 3: ...Revision Log a 31211476 Re v is ion L og REVISION LOG March 27 2020 A Original Issue of Manual...
Page 40: ...Section 2 Pre Operation and Inspection 2 14 31211476 This Page Intentionally Left Blank...
Page 60: ...Section 3 Controls and Indicators 3 20 31211476 This Page Intentionally Left Blank...
Page 98: ...Section 5 Attachments and Hitches 5 26 31211476 This Page Intentionally Left Blank...
Page 102: ...Section 6 Emergency Procedures 6 4 31211476 This Page Intentionally Left Blank...
Page 111: ...Section 7 Lubrication and Maintenance 7 9 31211476 This Page Intentionally Left Blank...
Page 122: ...Section 7 Lubrication and Maintenance 7 20 31211476 This Page Intentionally Left Blank...
Page 124: ...Section 8 Additional Checks 8 2 31211476 This Page Intentionally Left Blank...
Page 134: ...Inspection Maintenance and Repair Log Date Comments...