SECTION 3 - COMPONENT SERVICING
3-2
31215861
3.2 TOOL TRAY INSTALLATION
EcoLift50
EcoLift70
3.3 PLATFORM INSTALLATION
1.
Remove the four bolts, nuts and washers securing the
floor pan to the platform assembly. Remove floor pan.
2.
Remove the six bolts, nuts and washers securing the
platform assembly to the mast assembly.
3.
Loosen the bolt and nuts on the bottom rail cross-
member to allow the platform rails to clear the mast
mounting sockets.
4.
With the aid of an assistant, remove platform from
mast by pulling each rail out from it’s mast socket then
lifting the platform off and setting aside.
NOTE:
When assembling apply anti-seize compound to the plat
-
form rail attach bolts/nuts (item 4).
1.
Tool Tray
2.
Attach Screws and Washers
3.
Top of Mast Mounting Holes
1.
Tool Tray
2.
Attach Screws and Washers
3.
Top of Mast Mounting Holes
1
1
1.
Platform Assembly
2.
Floor Pan Assembly
3.
Floor Pan Mounting Bolts and Washers
4.
Platform to Mast Bolts and Washers
1
Go
to
Discount-Equipment.com
to
order
your
parts