![JLG 600A Operation And Safety Manual Download Page 78](http://html.mh-extra.com/html/jlg/600a/600a_operation-and-safety-manual_2020045078.webp)
SECTION 4 - MACHINE OPERATION
4-12
– JLG Lift –
3121615
b.
The Tower lift “down” will only operate when
the Tower Boom is fully retracted.
TO AVOID TILTING MACHINE IF TOWER BOOM SWITCHING MALFUNCTIONS:
— LOWER PLATFORM TO GROUND USING MAIN BOOM LIFT AND TELESCOPE FUNC-
TIONS.
— HAVE CONDITION CORRECTED BY A CERTIFIED JLG SERVICE TECHNICIAN BEFORE
CONTINUING USE OF MACHINE.
Raising and Lowering the Main Boom
To raise or lower the Main Boom, position the Main
Boom Lift switch to Up or Down until the desired
height is reached.
Telescoping the Main Boom
To extend or retract the main boom, use the Main
Telescope Control Switch to select In or Out move-
ment.
Summary of Contents for 600A
Page 2: ...NOTE This manual also applies to a machine with the following Serial Number 0300176207 ...
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 JLG Lift 3121615 NOTES ...
Page 66: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 22 JLG Lift 3121615 NOTES ...
Page 73: ...SECTION 4 MACHINE OPERATION 3121615 JLG Lift 4 7 Figure 4 3 Grade and Sideslope ...
Page 90: ...SECTION 4 MACHINE OPERATION 4 24 JLG Lift 3121615 Figure 4 9 Lifting Chart ...
Page 138: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 6 34 JLG Lift 3121615 NOTES ...
Page 141: ......