Section 4 - Operation
4-1
31200345
SECTION 4 - OPERATION
4.1
PREPARING MACHINE FOR PLATFORM OPERATION
The following must be completed from the cab to transfer power to the platform.
1. Verify platform is properly installed and quick attach lock pin is fully engaged. See
on page 5-3. Platform (
1
) will be shown on display.
2. Apply park brake.
3. Shift transmission control lever to neutral.
4. Fully retract boom and lower boom below 10 degrees.
5. Fully lower outriggers, lifting front tires and ensure machine is level. Display indicates
when outrigger (
2
) and level (
3
) requirements are satisfied.
6. Shut off engine and rotate key to Platform position. Display indicates machine is in
platform mode (
4
).
7. Remove key and verify the power/emergency stop switch is pulled up.
8. Exit cab.
O
Z
3
041
1
0000
0000
00
N
1
RPM
O
Z
3
051
3
2
0000
0000
00
N
1
RPM
O
Z
3
0
6
1
0000
0000
00
N
1
RPM
4
Summary of Contents for 3513PS
Page 2: ......
Page 10: ...Table of Contents iv 31200345...
Page 20: ...Section 1 General Safety Practices 1 10 31200345 This Page Intentionally Left Blank...
Page 34: ...Section 2 Pre Operation and Inspection 2 14 31200345 This Page Intentionally Left Blank...
Page 46: ...Section 5 Platform 5 4 31200345 This Page Intentionally Left Blank...
Page 50: ...Section 6 Emergency Procedures 6 4 31200345 This Page Intentionally Left Blank...
Page 53: ...Section 7 Lubrication and Maintenance 7 3 31200345 This Page Intentionally Left Blank...
Page 60: ...Section 8 Additional Checks 8 2 31200345 This Page Intentionally Left Blank...
Page 64: ...Section 9 Specifications 9 4 31200345 This Page Intentionally Left Blank...
Page 68: ...Inspection Maintenance and Repair Log Date Comments...
Page 69: ......