Section 2 - Pre-Operation and Inspection
2-1
31200345
SECTION 2 - PRE-OPERATION AND INSPECTION
2.1
PRE-OPERATION CHECK AND INSPECTION
Note:
Complete all required maintenance before operating unit.
Note:
Pre-operation check and inspection of the telehandler is to be completed first. Refer to
the Operation & Safety Manual supplied with telehandler.
The platform pre-operation check and inspection, performed at beginning of each work
shift or at each change of operator, should include the following:
1.
Cleanliness
- Check all surfaces for leakage (oil) or foreign objects. Report any
leakage to the proper maintenance personnel.
2.
Structure
- Inspect the platform structure for dents, damage, weld or parent metal
cracks or other discrepancies.
3.
Safety Decals
- Ensure all safety decals are legible and in place. Clean or replace as
required. See page 2-3 for details.
4.
Operation and Safety Manuals
- Operation & Safety Manual located in manual
holder.
5.
Walk-Around Inspection
- See page 2-8 for details.
WARNING
FALL HAZARD.
Use extreme caution when checking items beyond your normal reach.
Use an approved ladder.
O
A
H1000
PARENT METAL CRACK
WELD CRACK
Summary of Contents for 3513PS
Page 2: ......
Page 10: ...Table of Contents iv 31200345...
Page 20: ...Section 1 General Safety Practices 1 10 31200345 This Page Intentionally Left Blank...
Page 34: ...Section 2 Pre Operation and Inspection 2 14 31200345 This Page Intentionally Left Blank...
Page 46: ...Section 5 Platform 5 4 31200345 This Page Intentionally Left Blank...
Page 50: ...Section 6 Emergency Procedures 6 4 31200345 This Page Intentionally Left Blank...
Page 53: ...Section 7 Lubrication and Maintenance 7 3 31200345 This Page Intentionally Left Blank...
Page 60: ...Section 8 Additional Checks 8 2 31200345 This Page Intentionally Left Blank...
Page 64: ...Section 9 Specifications 9 4 31200345 This Page Intentionally Left Blank...
Page 68: ...Inspection Maintenance and Repair Log Date Comments...
Page 69: ......