Section 2 - Pre-Operation and Inspection
2-2
31200743
8.
Operational Check
- Once the walk-around inspection is complete, perform a
warm-up and operational check (see page 2-12) of all systems in an area free of
overhead and ground level obstructions. See Section 3 - Controls and Indicators for
more specific operating instructions.
WARNING
If telehandler does not operate properly, immediately bring machine to a stop, lower
boom and attachment to ground and stop the engine. Determine cause and correct
before continued use.
Summary of Contents for 2505H
Page 12: ...Table of Contents vi 31200743...
Page 31: ...Section 2 Pre Operation and Inspection 2 3 31200743 This Page Intentionally Left Blank...
Page 44: ...Section 2 Pre Operation and Inspection 2 16 31200743 This Page Intentionally Left Blank...
Page 70: ...Section 3 Controls and Indicators 3 26 31200743 This Page Intentionally Left Blank...
Page 84: ...Section 4 Operation 4 14 31200743 This Page Intentionally Left Blank...
Page 101: ...Section 5 Attachments and Hitches 5 17 31200743 This Page Intentionally Left Blank...
Page 120: ...Section 6 Emergency Procedures 6 4 31200743 This Page Intentionally Left Blank...
Page 127: ...Section 7 Lubrication and Maintenance 7 7 31200743 This Page Intentionally Left Blank...
Page 140: ...Section 7 Lubrication and Maintenance 7 20 31200743 This Page Intentionally Left Blank...
Page 154: ...Index 4 31200743...
Page 156: ...Inspection Maintenance and Repair Log Date Comments...
Page 158: ......