background image

 

-19-

 

 

Note

The installation method of bolt fitting (

NEXTracker

)

 is based on the experimental results in Jinko. 

The design of the NexTracker tracking bracket, the selection of accessories and the installation of modules 

should be completed by a professional system installer, which can refer to Jinko's mechanical load. 

The load described in this manual is the design load. When calculating the maximum test load, 1.5 times of 

safety factor should be considered. 

If the design load is greater than 1067Pa (1600Pa test load), consult the support supplier. 

* For details, consult with component suppliers and support suppliers.  

3. Wiring and connection 

a)  Before  this  procedure,  please  read  the  operation  instructions  of the  PV  system  carefully. 

Make  wiring  by  Multi-connecting  cables  between  the  PV  modules  in  series  or  parallel 
connection,  which  is  determined  by  user’s  configuration  requirement  for  system  power, 

current and voltage. 

b)  PV module connected in series should have similar current. Modules must not be connected 

together  to  create  a  voltage  higher  than  the  permitted  system  voltage(1500VDC).  The 

maximum number of modules in series depends on system design, the type of inverter used 

and environmental conditions. 

c)  The maximum fuse rating value in an array string can be found on the product label or in the 

product  datasheet.  The  fuse  rating  value  is  also  corresponding  to  the  maximum  reverse 

current  that  a  module  can  withstand.  Thus  based  on  the  maximum  series  fuse  rating  of 

module and local electrical installation criteria, make sure the modules strings in parallel for 

connection need to be assembled with appropriate string fuse for circuit protection. 

d)  Open the combiner box of the control system and connect the conductor from the PV arrays 

to the combiner box in accordance with the the design and local codes and standards. The 

cross-sectional area and cable connector capacity must satisfy the maximum short-circuit 

of the PV system (for a single component, we recommended that the cross-sectional area 

of cables be 4mm

2

 and the rated current of connectors be more than 10A), otherwise cables 

and  connectors  will  become  overheating  for  large  current.  Please  pay  attention  to  the 

temperature limit of cables is 85

e)  Follow the requirements of applicable local and national electrical codes. 

f)  These  modules  contain  factory  installed  bypass  diode  .if  these  modules  are  incorrectly 

connected to each other, the bypass diodes, cable or junction box maybe damaged. 

g)  It is recommend to use negatively grounded inverters to avoid the PID effect for non-PID 

free modules. 

h)  For  water  projects,  the  project  system  design  recommends  the  installation  of  inverter 

Summary of Contents for JKM M-72HL4-BDVP Series

Page 1: ...JinkoSolar Dual Glass Photovoltaic Module Installation Manual ...

Page 2: ...ation introduction 2 2 1 Climate condition 2 2 2 Site selection 2 2 3 Tilt angle selection 3 Wiring and connection 4 Maintenance and care 5 Electrical specification Edition 05 2022 4 1 Visual Inspection 4 3 Inspection of Connector and Cable 21 22 6 Disclaimer of Liability 21 4 2 Cleaning 2 3 1 The installation of Dual Glass modules without frame 2 3 2 The installation of Dual Glass modules with fr...

Page 3: ...0W where general contact access is anticipated Modules qualified for safety through EN IEC 61730 1 and 2 within this application class are considered to meet the requirements for Safety Class II 1 2 Warnings PV modules generate DC electrical energy when exposed to sunlight or other light sources Active parts of module such as terminals can result in burns sparks and lethal shock Artificially conce...

Page 4: ...her national code Under normal conditions a photovoltaic module is likely to experience conditions that produce more current and or voltage than reported at standard test conditions Accordingly the value of Isc and Voc marked on the module should be multiplied by 1 25 when determining PV system component voltage ratings conductor current ratings fuse sizes and size of controls connected to the PV ...

Page 5: ...with oily substances organic solvents and other corrosive materials to avoid damage to the connector For example alcohol gasoline lubricants rust inhibitors herbicides and so on Before the installation of modules it is recommended to add rainproof facilities in the project site to avoid direct open air placement Corner protection of DV module is used to protect the module during transportation and...

Page 6: ...et Use insulated tools and do not use wet tools When installing PV modules do not drop any objects e g PV modules or tools Make sure flammable gasses are not generated or present near the installation site Insert module connectors fully and correctly An audible click sound should be heard This sounds confirms the connectors are fully seated Check all connections The module leads should be securely...

Page 7: ...ure range of 40 C to 40 C Note The mechanical load bearing include wind and snow loads of the module is based on the approved mounting methods The professional system installer must be responsible for mechanical load calculation according to the system design 2 2 2 Site Selection In most applications Jinko solar PV modules should be installed in a location where they will receive maximum sunlight ...

Page 8: ...n the distance protect the connectors or add dust plugs After removing the dust plugs connect the connectors immediately and take other anti rust measures to prevent rust When the modules are installed on the roof they must be separated from the roof by more than 10cm to facilitate air circulation and heat dissipation 2 2 3 Tilt Angle Selection The tilt angle of the PV module is measured between t...

Page 9: ...ass Rating for a non BIPV module or panel A minimum slope of 22 5 is required for installations in roof mounted systems in order to maintain the fire class ratings Any module or panel mounting system have limitations on inclination required to maintain a specific System Fire Class Rating ...

Page 10: ...t two modules Table 1 Jinko Dual glass modules without frame mounted clamps Be sure to avoid shadowing effects from the module clamps When choosing this type of clamp mounting method please be sure to use at least six clamps on each modules and three clamps should be attached on each long side of the module Depending on the local wind and snow loads if excessive pressure load is expected additiona...

Page 11: ...face 1600 Pa Back surface 1600 Pa 120mm Front surface 3600 Pa Back surface 1600 Pa 200mm Type2 Group 9 12 Front surface 1600 Pa Back surface 1600 Pa 200mm The middle of clamp should be between J and K J 300mm K 400mm L 1 2 module length Front surface 3600 Pa Back surface 1600 Pa 250mm ...

Page 12: ...up 21 22 The middle of clamp should be between J and K J 450 K 550 4 Group 23 31 The middle of clamp should be between J and K J A 5 K A 4 Note A module length Table 2 The mounting method of clamps for Dual glass modules without frame Module type Dimensions mm Maximum designed mechanical load 3600Pa positive 1600Pa negative A B J K Group 1 Group 5 1968 992 300 400 Group 2 Group 6 1658 992 300 400 ...

Page 13: ...1039 2090 1038 L 4 50 L 4 50 Group 22 1750 1039 1750 1038 300 400 Group 23 Group 24 1701 1122 1717 1132 1719 1134 1669 1122 1685 1132 1678 1134 A 5 A module length A 4 A module length Group 25 Group 26 1884 1122 1901 1132 1904 1134 1868 1134 1865 1132 1848 1122 A 5 A module length A 4 A module length Group 27 Group 28 2027 1122 2046 1132 2049 1134 2089 1134 2086 1132 2067 1122 A 5 A module length ...

Page 14: ... the installation Step 1 Install the rail Graphical representation Install the rail Step 2 Install the clamp Graphical representation Put the clamp into the rails Step 3 Install the module Graphical representation Put the module into the clamp and tighten the screw about 16 20N m Table 4 The Schematic Diagram of the installation process of clamps ...

Page 15: ... PV module The applied torque value should be big enough to fix the modules steadily The reference value for M8 bolt is 16 20N m As to special support system or special installation requirement please reconfirm with the support s supplier for the torque value Please find detailed mounting information in the below illustration as Figure 2 and Table 5 Figure 2 The mounting method of bolts for Dual g...

Page 16: ...stalled with bolts fitting method Note The installation method of bolt fitting is based on the experimental results inJinko 2 3 2 2 Fixation with clamps at long sides of frames The module clamps should not come into contact with the front glass and must not deform the frame Be sure to avoid shadowing effects from the module clamps The module frame is not to be modified under any circumstances When...

Page 17: ... 15 bigger than J and less than K as shown below Figure 4 The mounting method of clamps for Dual glass modules with frame ...

Page 18: ...2023 1018 350 480 Group 2 Group 7 40 2000 992 280 480 2031 1008 2054 1018 350 480 Group 3 35 1674 998 1686 1008 1699 1018 1656 992 280 420 Group 4 Group 8 35 1698 998 1680 992 1704 1008 1727 1018 280 420 Group 5 40 35 1974 998 280 480 Group 6 40 35 1664 998 280 420 Group 19 Group 20 30 1701 1122 1717 1132 1719 1134 1669 1122 1685 1132 1678 1134 A 4 50 A module length A 4 50 A module length Group 2...

Page 19: ... of 1 5 times So Jinko modules are tested under a maximum downward pressure of 5400Pa and upward pressure of 2400Pa When mounting modules in snow prone or high wind environments special care should be taken to mount the modules in a manner that provides sufficient design strength while meeting local code requirements 4 When installing the Dual glass modules at a certain angle please installed the ...

Page 20: ... 26 30 2274 1134 2278 1134 2230 1134 1 4L 50 1 4L 50 Group 28 30 35 2465 1134 1 4L 50 1 4L 50 Table8 Mechanical dimensions when modules installed at long side Clamp fitting method 2 3 2 4 Mounting with Bolts NEXTracker four mounting holes Figure 5 PV module installed with bolt fitting method NEXTracker Module type Frame A B mm Maximum designed mechanical load and Method of installation 400mm JKMxx...

Page 21: ...rating value in an array string can be found on the product label or in the product datasheet The fuse rating value is also corresponding to the maximum reverse current that a module can withstand Thus based on the maximum series fuse rating of module and local electrical installation criteria make sure the modules strings in parallel for connection need to be assembled with appropriate string fus...

Page 22: ...facturers should not be mated together If need to replace please contact Jinko Solar l All module frames and mounting racks must be properly grounded in accordance with local and national electrical codes Attach the equipment grounding conductor to the module frame using the hole and hardware provided Note that a stainless steel star washer is used between the ground wire and module frame see Figu...

Page 23: ...loth dry or damp as necessary Water with high mineral content may leave deposits on the glass surface and is not recommended It is recommended to use neutral water to clean the glass to avoid strong acid and alkali so as not to cause damage to the glass coating layer b Never use abrasive material under any circumstances c In order to reduce the potential for electrical and thermal shock Jinko reco...

Page 24: ...ed in the manual and for any disputes caused by no quality reasons Intellectual Property Right No responsibility is assumed by Jinko for any infringement of intellectual property or other rights of third parties which may result from use of the PV product No license is granted by implication or otherwise under any intellectual property rights or related use authorization Jinko reserve the right to...

Page 25: ...250 420 in steps of 5 Group 6 JKMxxxM 60 DV JKMSxxxM 60 DV JKMxxxM 60 DV J JKMSxxxM 60 DV J JKMxxxM 60H DV xxx 210 350 in steps of 5 Group 7 JKMxxxM 48 DV JKMSxxxM 48 DV JKMxxxM 48 DV J JKMSxxxM 48 DV J xxx 170 250 in steps of 5 Group 8 JKMxxxM 36 DV JKMSxxxM 36 DV JKMxxxM 36 DV J JKMSxxxM 36 DV J xxx 150 180 in steps of 5 Group 9 JKMxxxM 72 BDV xxx 300 420 in steps of 5 JKMxxxM 72 BDVP xxx 315 43...

Page 26: ... xxx JKSN3 DDCA xxx xxx 400 450 in steps of 5 Group 14 JKSM3 CDCA xxx JKSN3 CDCA xxx xxx 340 380 in steps of 5 Group 15 JKMxxxM 78H BDVP xxx 405 470 in steps of 5 JKMxxxN 78H BDV xxx 410 470 in steps of 5 Group 16 JKMxxxM 66H BDVP xxx 340 390 in steps of 5 JKMxxxN 66H BDV xxx 345 395 in steps of 5 Group 17 JKMxxxM 7RL3 BDVP JKMxxxM 7RL3 BDVP J xxx 420 490 in steps of 5 JKMxxxN 7RL3 BDV xxx 425 485...

Page 27: ...f 5 Group 23 JKMxxxM 54HL4 BDVP xxx 345 405 in steps of 5 JKMxxxN 54HL4 BDV xxx 345 415 in steps of 5 Group 24 JKMxxxM 5RL4 BDVP xxx 345 405 in steps of 5 JKMxxxN 5RL4 BDV xxx 350 415 in steps of 5 Group 25 JKMxxxM 60HL4 BDVP xxx 385 450 in steps of 5 JKMxxxN 60HL4 BDV xxx 385 465 in steps of 5 Group 26 JKMxxxM 6TL4 BDVP xxx 385 450 in steps of 5 JKMxxxN 6TL4 BDV xxx 385 465 in steps of 5 Group 27...

Page 28: ... BDV xxx 460 555 in steps of 5 Group 31 JKMxxxM 7RL4 BDVP JKMxxxM 7RL4 BDVP J xxx 490 585 in steps of 5 JKMxxxN 7RL4 BDV xxx 500 605 in steps of 5 2 Dual glass with frame series products Group 1 JKMxxxM 72 BDV xxx 300 420 in steps of 5 JKMxxxM 72 BDVP xxx 315 430 in steps of 5 Group 2 JKMxxxM 72H BDV xxx 300 420 in steps of 5 JKMxxxM 72H BDVP xxx 315 430 in steps of 5 Group 3 JKMxxxM 60 BDV xxx 25...

Page 29: ... 8 JKMxxxM 60H MBB BDVP xxx 310 360 in steps of 5 JKMxxxN 60H MBB BDV xxx 315 370 in steps of 5 Group 9 JKMxxxM 78H BDVP xxx 405 470 in steps of 5 JKMxxxN 78H BDV xxx 410 470 in steps of 5 Group 10 JKMxxxM 66H BDVP xxx 340 390 in steps of 5 JKMxxxN 66H BDV xxx 345 395 in steps of 5 Group 11 JKMxxxM 7RL3 BDVP JKMxxxM 7RL3 BDVP J xxx 420 490 in steps of 5 JKMxxxN 7RL3 BDV xxx 425 485 in steps of 5 G...

Page 30: ...xM 72H DV xxx 250 420 in steps of 5 Group 18 JKMxxxM 60H DV xxx 210 350 in steps of 5 Group 19 JKMxxxM 54HL4 BDVP xxx 345 405 in steps of 5 JKMxxxN 54HL4 BDV xxx 345 415 in steps of 5 Group 20 JKMxxxM 5RL4 BDVP xxx 345 405 in steps of 5 JKMxxxN 5RL4 BDV xxx 350 415 in steps of 5 Group 21 JKMxxxM 60HL4 BDVP xxx 385 450 in steps of 5 JKMxxxN 60HL4 BDV xxx 385 465 in steps of 5 Group 22 JKMxxxM 6TL4 ...

Page 31: ...eps of 5 JKMxxxN 7TL4 BDV xxx 460 555 in steps of 5 Group 27 JKMxxxM 7RL4 BDVP JKMxxxM 7RL4 BDVP J xxx 490 585 in steps of 5 JKMxxxN 7RL4 BDV xxx 500 605 in steps of 5 Group 28 JKMxxxN 78HL4 BDV xxx 590 610 in steps of 5 Notes 1 PP the eagle series module 2 DV photovoltaic Module Dual glass with 1500V 3 JKMS the smart series module 4 J customized product for Japanese market 5 BDV the bifacial N ty...

Page 32: ...type Technology Cell Number Module Type Cell Junction Box STC condition JKS p type Mono M Full cell 1 60 A Normal mono facial A 158 5BB Mono facial A Normal A BSTC condition JKB Poly P Half cell 2 72 B All black mono facial B 158 5BB Bi facial B MX B N type Mono N TR 3 66 C Transparent back sheet C 158 9BB Bi facial C MX3 C Shingling 4 78 D Bifacial dual glass D 161 9BB Bi facial D EP D ...

Page 33: ..._____________________________ ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ __________________________________________________________________...

Page 34: ...ent Zone Jiangxi Province China 334100 Tel 86 793 858 8188 Fax 86 793 846 1152 Jiangxi Manufacture Base No 58 Yuanxi Road Haining Yuanhua Industrial Park Zhejiang Province China 314416 Tel 86 573 8798 5678 Fax 86 573 8787 1070 Zhejiang Manufacture Base Jinko Building 99 Shouyang Road Jingan District Shanghai China 200027 Tel 86 21 5183 8777 Fax 86 21 5180 8600 ...

Reviews: