![JETStream EUROJET Installation And Operating Instructions Manual Download Page 13](http://html1.mh-extra.com/html/jetstream/eurojet/eurojet_installation-and-operating-instructions-manual_3861487013.webp)
27
Wiring diagramm for JETSTREAM EuroJet, BAMBO2, BAMBO, COCO
(versions without illumination), JUNO, LIBRA 3-5, LIDO, LIDO 2, VIVA
with pneumatic switch 3N ~ PE 400 V
Wiring diagramm for JETSTREAM, EuroJet, BAMBO2, BAMBO, COCO
(versions without illumination), JUNO, LIBRA 3-5, LIDO, LIDO 2,
VIVA with pneumatic switch and time relay 3N ~ PE 400 V
Wiring diagramm for JETSTREAM, EuroJet, BAMBO2, BAMBO,
COCO (versions without illumination), JUNO, LIBRA 3-5, LIDO, LIDO
2, VIVA with pneumatic switch and token box 3N ~ PE 400 V
Pump
control panel
build
PE
M1
3~ M
K1
4
21
4
6
BN
A2
A2
BU
N
N
1
2
1
3
S1
2 2.3
4 2.4
6 2.4
14 2.4
1-
1-
3-
5-
13-
2 2.5
PE
PE
L1
L2
L3
N
PE
L1
L2
L3
N
PE
4A
30mA
F1
16A
5
3
4
1
5
3
1
26
4
2
6
5
3
17
4
2
8
6
F2
S1
5
3
1
4
26
5
3
1
13
F3
1
2
F4
RD
RD
K2
A1
K2
2
13
A1
1-
2 .5
4x2,5mm
ý
K1
PE
M1
3~ M
K1
3.5
4
21
4
6
2-60 min.
A2
A2
A1
N
1
18
S2
2 3.2
4 3.3
6 3.3
14 3.3
15
1-
3-
5-
13-
18 3.5
PE
PE
L1
L2
L3
N
PE
L1
L2
L3
N
PE
30mA
F1
16A
5
3
4
1
5
3
1
26
4
26
5
3
17
4
28
6
F2
S1
5
3
1
4
26
5
3
1
13
F3
3
RD
K1
A1
K2
B1
2
1
3
15
K2
3.4
4x2,5mm
ý
control panel
2.3
4.3
6.3
14.4
1-
1-
3-
5-
13-
2.5
30mA
4
2
F2
PE
M1
~ M
K1
4
2
14
6
BN
A2
A2
A1
BU
N
N
1
2
1
3
S1
4x2,5mm
ý
PE
PE
L1
N
PE
L1
N
PE
4A
F1
16A
1
3
1
2
4
2
S1
53
1
4
26
5
3
1
13
F3
1
2
F4
RD
RD
K2
A1
K2
K1
2
1
1-
2.5
3
1
cut the general electric connection
before opening the electric control box.
N
1
3
5
1 3 5 13 A1
PE
N
L1 L2 L3
2 4 6
6
4
2
N
14 A2
Electric cable 380 V 3N~PE
Gr
ound
Cir
cuit br
eaker
Circuit
breaker
diving
Main
contactor
Remote contr
ol
Towards engine
Pump
build
Pump
control panel
build
pneumatic
switch
pneumatic
switch
pneumatic
switch