Installation
1. Place the valve into position on the manifold.
Using the palms of your hands, press the
valve into the manifold as shown (Figure 68).
2. Install the remaining valves.
3. Swing the manifold upward to install the bolts.
4. Install the manifold bolts and tighten in a criss-
cross sequence starting with the center bolts
(Figure 69). Proper torque is 350 ft.-lb. (470
N·m).
5. Connect the water lubrication lines (Figure 70)
to the stuffing boxes and close the rod box
cover.
6. Connect the supply coupling (Figure 71) and
the bypass hose to the manifold.
Figure 69:
Tightening Sequence.
Cover
Lubrication
Lines
Figure 70:
Connecting the Water Lubrication Lines.
Bypass Hose
Supply Coupling
Figure 71:
Hose Connections.
Figure 68:
Installing the Valves.
Valve
Summary of Contents for 3000 series
Page 1: ...OPERATION MANUAL Bareshaft Pump...
Page 2: ...ii Visual Safety System...
Page 8: ...Operation Manual viii...
Page 12: ...Operation Manual 4...
Page 26: ...Operation Manual 18...
Page 32: ...Operation Manual 24...
Page 80: ...Operation Manual 72...
Page 83: ......