Operation Manual
28
13.
Pull each stuffing box from the pump case
(Figure 29).
14.
Clean the stuffing box bore thoroughly and
apply petroleum jelly or Anti-Seize to the
bores.
15.
Install the new stuffing boxes into the pump
case. Orient the stuffing boxes so the flat face
on the outer diameter matches the flat face in
each case bore.
16.
Extend the plunger from each stuffing box until
it mates with the opposing crosshead pony
rods. Install the plunger coupling (Figure 30)
on each plunger and secure with the two bolts.
Tighten the bolts to 20 ft.-lb.(27 N·m).
17. Ensure the gland nuts are tight. Use the pump
wrench and a 5 lb. (2 kg) hammer to tighten
the gland nuts to approximately 250 ft.-lb.(338
N·m) (Figure 31). Hit the wrench about three
times using moderate power. This should sup-
ply sufficient torque on the nut.
ATTENTION
Apply petroleum jelly or Anti-Seize to each
stuffing box bore when installing stuffing boxes
to help prevent corrosion and extend pump life.
Figure 29:
Stuffing Box Removal.
Figure 30:
Plunger Coupling Installation.
Plunger Coupling
Figure 31:
Tightening the Gland Nuts.
Summary of Contents for 3000 series
Page 1: ...OPERATION MANUAL Bareshaft Pump...
Page 2: ...ii Visual Safety System...
Page 8: ...Operation Manual viii...
Page 12: ...Operation Manual 4...
Page 26: ...Operation Manual 18...
Page 32: ...Operation Manual 24...
Page 80: ...Operation Manual 72...
Page 83: ......