
1.ODQ.1B
Table 1
Drawings Not
To Scale
Dimensions in mm
A
A1
A2
B
B1
C
D
E
F
Y
1050
1150
1100
502
530
850
300/400
240
800
350
Fig. 1
C
E
50
D
A
A1
A2
B1
Y
F
D
B
MODEL
A
B
+ recess
C
+ Base
1050
1400
760
+ recess
Please note that these dimensions (based on 75mm ACC Block margins) are the absolute minimum sizes - widths (A & C) maybe
increased if desired.
IMPORTANT:
Jetmaster firebox is
raised
500mm
and
must be
seated on top of
a 75mm
hebel
sheet
which is
placed
on top of
a
steel structure
or masonry blocks
.
A TIMBER BASE IS NOT ACCEPTABLE
The appliance, gather, flue and hebel panel weighs approx 400kg. Ensure the base structure can withstand this load.
IMPORTANT:
THE APPLIANCE MUST BE INSTALLED AT LEAST 1200
mm
AWAY FROM COMBUSTIBLE ADJACENT WALLS (EG. HOUSE)
MINIMUM CAVITY SIZE
1400
+ 500
NOTE: Minimum Recess = 40mm / Maximum Recess = 100mm
F
IREBOX INSTALLATION
1.
Locate and position firebox, fit and seal gather in cavity using fire cement (exhaust cement) and bolts
(supplied), to the
firebox. Note: Pop rivet back of gather to firebox if required (refer to Cross Section).
2.
Please note that the firebox MUST be positioned onto 25mm high non-combustible spacers (eg Hebel or NCB)
this is
to ensure the bottom flange of the box is level with the concrete or Hebel base for the appliance to sit on.
3.
Earthquake restraints may be positioned by drilling through firebox into the floor protector, in a position
midway beneath the
log-pan. Two 6mm dynabolts or similar will suffice. Do not over tighten and deform
firebox.
4.
Attach rock wool (supplied) to the sides of the firebox and gather (using fire cement).
DO NOT BLOCK OFF
the air entry
between the inner flue pipe and flue pipe casing or the air circulation between the vent
holes in the cavity.
5.
Refer to page
5
of this document for minimum hearth sizes. Please note, a hearth is not required when
the floor surface
below the fire is non combustible ie: concrete pavers, etc.
J
ETMASTER BOX DIMENSIONS