7. INSTALLATION PROCEDURES
Cleaning Booth Installation
On supply this Cleaning Booth will consist of either:
1.
UK only
- Booth, extractor & a length of flexible ducting. All individual items are LEV
compliant, but correct assembly & installation must take place (by a LEV service
provider) to make a fully compliant system. It is a legal requirement that a full
commissioning report is obtained prior to system use.
2.
Booth only. In this instance it is the customers responsibility to connect & supply
adequate extraction. A minimum of 5m/s of airflow is recommended under a blocked
filter condition. A user gauge is recommended (this is an essential legal requirement in
the UK). This is so an operator knows the booth is working correctly before they use
the system.
3.
Unpack the consignment and position the main Booth assembly in place.
•
Remove 4x Black Transport brackets from the base. Fit the 4x M16 feet and
level. Door adjustment can be achieved by loosening off the 6 cap head bolts
retaining the door hinge. Once the adjustment has been made the 6 cap head
bolts must be tightened.
•
Fix anchor brackets & feet (via knock-
out’s under chrome top cap) to floor as
required.
To fit the roof filter
•
Fit the black plastic slider plate
to the booth roof, using the
countersunk fixings provided.
Ensure that all 4 air inlet holes
are clear of the slider plate.
•
Fit the metal filter retaining
frame on top of the slider plate.
The open end should be
positioned on the maintenance
access side.
•
Fit the roof mounted filter with the handle facing outwards, for easy
removal.