17
Figure 19
10.8
Belt Replacement
Refer to Figures 20 - 22:
Preparation
To replace the
cutterhead drive belt
and/or the
planer feed-roller belt
, the jointer fence assembly
and two back panels must first be removed as
described below. A 4mm hex wrench, 5mm hex
wrench, and 17mm open wrench are required.
Disconnect machine from
power
source
before
making
any
adjustments. Failure to comply may cause
serious injury.
1. Disconnect machine from power source.
2. Remove four
button head socket screws
(B)
and the
jointer fence assembly
(A).
3. Remove two
button head socket scre
ws (D)
and the
upper back panel
(C).
4. Remove four
button head socket scre
ws (F)
and the
lower back panel
(E).
5. Loosen
top nut
(L) on the
tension adjustment
screw
(N), then turn the
bottom nut
(M) to
raise the
motor
(I) and create slack in
feed-
roller belt
(H) and
cutterhead drive belt
(G).
If there is still tension in feed-roller belt,
loosen two socket head cap screws attaching
gearbox to cabinet using a 5mm hex wrench.
6. Remove the
feed-roller belt
(H) from around
the
feed-roller pulley
(P) and
motor pulley
(K).
If the
cutterhead drive belt
(G) is to be replaced,
continue. Otherwise, proceed to step 10.
Cutterhead Drive Belt Replacement
Note:
If the
cutterhead drive belt
(G) is to be
replaced, steps 1 - 6 must be performed to
remove the
feed-roller belt
(H) before the
cutterhead drive belt can be replaced.
7. Remove
cutterhead drive belt
(G) from
around
cutterhead pulley
(O) and
pulley
(J).
8. Loop the new cutterhead drive belt around
the larger (inner)
motor pulley
(J) and
cutterhead pulley
(O).
If the
feed-roller belt
(H) is to be replaced as well,
proceed to step 10. Otherwise, continue.
9. Loop the original
feed-roller belt
(H) around
the smaller (outer)
motor pulley
(K) and
feed-
roller pulley
(P).
Proceed to step 11.
Feed-Roller Belt Replacement
10. Loop the new feed-roller belt around the
smaller (outer)
motor pulley
(K) and
feed-
roller pulley
(P).
Concluding Steps
11. Turn
bottom nut
(M) on
tension adjustment
screw
(N) to lower the
motor
(I) and create
tension in
feed-roller belt
(H) and
cutterhead
drive belt
(G), then tighten the
top nut
(L).
If the gearbox was adjusted in step 5,
reposition the gearbox to maintain tension on
the feed-roller belt and tighten the two socket
head cap screws.
12. Replace the
lower back panel
(E),
upper back
panel
(C), and
jointer fence assembly
(A) with
their respective screws.
Figure 20
Summary of Contents for JPJ-12B
Page 28: ...28 15 1 Infeed Table Assembly Exploded View ...
Page 30: ...30 15 3 Outfeed Table Assembly Exploded View ...
Page 32: ...32 15 5 Cutterhead Assembly Exploded View ...
Page 34: ...34 15 7 Planer Table Assembly Exploded View ...
Page 36: ...36 15 9 Blade Guard Assembly Exploded View ...
Page 38: ...38 15 11 Gearbox Assembly Exploded View ...
Page 40: ...40 15 13 Cabinet Assembly Exploded View ...
Page 43: ...43 15 15 Fence Assembly Exploded View ...
Page 45: ...45 16 0 Electrical Connections for JPJ 12B JPJ 12BHH ...
Page 47: ...47 ...
Page 48: ...48 427 New Sanford Road La Vergne Tennessee 37086 Phone 800 274 6848 www jettools com ...