![Jet 22-44 Pro-3 Operating Instructions And Parts Manual Download Page 23](http://html2.mh-extra.com/html/jet/22-44-pro-3/22-44-pro-3_operating-instructions-and-parts-manual_3826130023.webp)
23
the bolts go through the tension roller brackets
and drum shield. Install the new inboard
bearing.
10. Center the drum between the carriage legs
before tightening bolts. Tighten the bolts in the
bearing and the set-screws in the bearing
collar.
11. Install the driven pulley (shown in Figure 35)
making sure it aligns with the drive pulley on
the motor. Tighten the set-screw.
12. Install the outer half of the belt guard cover and
tighten the six #10-32 screws.
13. Align the drum and tension v-belt according to
instructions in this manual.
14. Check all bolts and set-screws for tightness,
and check them again after sanding for 30
minutes.
Figure 35
Summary of Contents for 22-44 Pro-3
Page 35: ...35 Stand Assembly...
Page 37: ...37 Drum Head Assembly...