JENTNER DIGITAL II Operating Instructions Manual Download Page 4

                                                                                                                          

 

 

Side 4 

 Operating Instructions DIGITAL II Version 2.0

 

 
The anode rods 

 can be pulled out very easily, the cathode rod 

 in the middle can be screwed 

out (clockwise).  

 
Agitation (cathode 

rod)  

The movement is effected by a built-in driving motor. The movement can be started with the button 

 

“Motor / Movement”. 

 

 
Heating of the bath 

 

The heater is fixed with a special holder in the corresponding galvanic bath. The temperature is 
controlled continuously by an included temperature sensor (thermo couple / level regulator). 
Attention! Heater and temperature sensor must always hang together in a tank. 

Only for intended 

use! 

The immersion heater is inserted for operation on the case back to a socket. The immersion 

heater can be turned on by a button on the control panel. The heating is regulated automatically. 
Attention! The level regulator turns off the heater if the volume is too low! Nevertheless, the heater 
must be turned on only when the working tank is filled with liquid. If the level is too low, or if the 
immersion heater is outside the tank, there is the risk of fire and the destruction of working tank and 
immersion heater. The holders of immersion heater and sensor must be fixed to the side of the tank 
and not at the anode rod.  

 
Anode materials 

 

The anodes must be fixed on the outer anode rods 

. Attention! Pay attention for a good 

conductive contact. The required anode material (for example stainless steel, MOX, fine-silver, 
platinized titanium) depends on each plating bath. Please note the information in the data sheets of 
the chemical producer. Our scope of delivery contains anodes in various dimensions.  

 
Process parameter / course of process 

 

The parts should be put on a jig (for example we deliver a special a jig for rings or for chains) and 
fixed on the middle cathode rod 

. Pay always attention for a good conductive contact. Please 

clean the cathode rod continuously.  
The first step in the small-size-electroplating unit must be the electrolytic degreasing bath. Anything 
else depends on your needs. Rinse well in distilled water after each step. Always follow the 
information on the product data sheets.  

 
Pen-plating 

 

With this machine you have also the opportunity to galvanize partially. Therefore, you need the 
galvanizing pen and tweezers. You have to connect both to the allowed ports 

 and 

. These 

ports are situated in the left front of the machine. The required voltage is set by the chosen program. 
The special chemicals for the pen-plating process (rhodium, silver, gold electrolytes) can be delivered 
by us or any other chemical producer.  

 
Covering of the machine 

 

The cover takes care of the sensitive and valuable plating solutions, it protects them against dust and 
dirt whenever the machine is not in use. Attention! When working with heated bathes the cover has 
to left open. If the cover is closed it is possible that the heat accumulation deforms the cover.

 

 

Summary of Contents for DIGITAL II

Page 1: ...ions Small Size Electroplating Unit DIGITAL II Version 2 0 Jentner Plating Technology GmbH Johann Staib Strasse 2 75179 Pforzheim Germany Tel 07231 418 094 0 FAX 07231 418 094 77 info jentner de www j...

Page 2: ...ht 250 mm weight 18 kg The DIGITAL II Version 2 0 includes 8 tanks PP 4 working and 4 rinsing tanks Dimension 150 x 100 x 150 mm Volume 1 5 litre 1 safety protection cable 1 thermo couple with titaniu...

Page 3: ...ure Button Volt setting voltage Button Charge setting Amin charge Button Time setting of exposure time Button Basin selection of the working tank Button OK save of the set values Button Prog selection...

Page 4: ...uctive contact The required anode material for example stainless steel MOX fine silver platinized titanium depends on each plating bath Please note the information in the data sheets of the chemical p...

Page 5: ...unit is short circuit proof if there will be short circuit between cathode and anode The fuse is located on the backside of the machine situated in main connection socket inside fuse holder Only micr...

Page 6: ...ion 2 0 Example Charge Rhodium bath Each plating bath uses a theoretical deposition value eg Rhodium approximately 6 mg Amin value see product description You can now choose whether a deposition time...

Page 7: ...inum Ni Nickel Cu Copper The programs from 1 to 6 are unnamed For each tank up to 3 programs can be installed Approach to programming 1 Turn on main switch 2 Press button progr 3 Select with the rotar...

Page 8: ...done for this process Do as following 1 Press button basin 3 seconds 2 Enter the desired value and basin 3 Press save 4 Leave with OK 5 Press button progr and choose the desired one 6 Set the same bas...

Page 9: ...Side 9 Operating Instructions DIGITAL II Version 2 0...

Reviews: