Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Step # 58
Installing the right acrylic tube
Locate the RIGHT side candy tube. If not labeled, it is the one where the
installed bottom PVC elbow will be pointed 90 degrees towards the
cabinet. Locate the loose upper PVC elbow and pass the LED lights
through the opening in the elbow. Then secure the elbow to the top of
the tube.
Check Box When This Step is Complete
Step # 59
Installing the right acrylic tube
With the assistance of another able-bodied adult - have them hold the
candy tube assembly up against the main cabinet.
Check Box When This Step is Complete
Step # 60
Routing the electrical connection into the main cabinet
CAUTION
THE ENTIRE TUBE ASSEMBLY WEIGHS APPROX. 30
POUNDS
Pass the electrical connection in the upper part of the tube into the
access hole in the header and then push the entire assembly against
the cabinet.
JET Games Corporation
Gum Drop Service Manual