background image

MANUFACTURED BY:

www.JENNISONGAMES.com

For Additional Information or for an Electronic Copy of This Manual Visit Our Website

Jennison Entertainment Technologies Corporation

822 South Nova Road 

 

Daytona Beach, Florida 32114 

 

U.S.A.

 Toll Free Number: 1-855-JET-GAME

 Service Email: [email protected]

 Phone Number: 1-386-255-1599

 Fax Number: 1-386-255-1589

 Information Email: [email protected]

VERSION 1.1

GUM DROP SERVICE MANUAL

Summary of Contents for GUM DROP

Page 1: ...r Website Jennison Entertainment Technologies Corporation 822 South Nova Road Daytona Beach Florida 32114 U S A Toll Free Number 1 855 JET GAME Service Email Service JennisonGames com Phone Number 1 3...

Page 2: ...t TBD 12 Attaching The Side Tubes Checking The Mechanical Switchs 51 32 35 14 Inspecting For Shipping Damage Opening The Boxes 15 Removing The Glass Brackets Locating The Accessories Connecting The Co...

Page 3: ...e information contained within Failure to follow the given information could lead to personal injury or property damage Follow all instructions contained within this manual and do not make any modific...

Page 4: ...f awareness Seizures may also cause loss of consciousness or convulsions that can lead to injury from falling down or striking nearby objects Immediately stop playing and consult a doctor if you exper...

Page 5: ...reading the entire installation guide in this manual GUM DROP CAUTIONS NOTICES DANGER DO NOT perform repairs or maintenance on the game with the power ON Always turn the power OFF and unplug the unit...

Page 6: ...vice GUM DROP Contact J E T first with any questions before replacing any part WARNING If the power cord is damaged replace it with a new one DO NOT attempt to use a damaged or repaired power cord WAR...

Page 7: ...ue 4 This Class A digital apparatus meets all requirements of the Canadian Interference Causing Equipment Regulations Cet appareil num rique da la classe A respecte toutes les exigences du R glement s...

Page 8: ...he construction on GUM DROP As of January 2018 Jennison Entertainment Technologies has tested all components used in the manufacturing of GUM DROP All components have been found to be within the stand...

Page 9: ...ECTION 2 MAIN CABINET LENGHTH WIDTH HEIGHT WEIGHT INCHES MM INCHES MM INCHES MM POUNDS KG 26 650 30 750 39 5 1000 144 65 LENGHTH WIDTH HEIGHT WEIGHT SECTION 1 CONSOLE MM POUNDS KG 28 700 45 1140 87 22...

Page 10: ...LECTRICAL REQUIREMENTS VOLTS IF YOU CHOOSE TO CONVERT YOUR UNIT TO A DIFFERENT LINE VOLTAGE THAT IT WAS AT INITIAL TIME OF DELIVERY YOU MUST ALSO SELECT THE NEW INPUT AC VOLTAGE ON THE POWER SUPPLY DO...

Page 11: ...NING AS SEEN IN THE FOLLOWING CHART FAILURE TO FOLLOW THIS MANUAL IN ITS ENTIRITY COULD LEAD TO SERIOUS BODILY INJURY IF THERE IS ANY DOUBT DURING THE INSTALLATION OF THIS UNIT CONTACT JENNISON ENTERT...

Page 12: ...ING AND PALLET MAY BE DIFFERENT THAN SEEN IN PHOTO The game has THREE pieces that are strapped to the pallet The pieces include the Console unit section 1 the Main cabinet section 2 and the Header sec...

Page 13: ...inet INSTALLATION INSTRUCTIONS Removing the box from the header section Carefully cut the stretch wrap on the header section using either scissors box cutters or a protected razor blade Be careful not...

Page 14: ...AS IT COULD DAMAGE ACRYLIC OR CABINET GRAPHICS Check Box When This Step is Complete Step 8 Check Box When This Step is Complete Step 9 Removing the glass brackets There are two metal brackets holding...

Page 15: ...right bracket and keep the screws for use later in the installation process These screws will be used to secure the header section to the main cabinet Step 11 Removing the glass brackets Check Box Whe...

Page 16: ...are stored in the rear part of the cabinet Step 14 INSTALLATION INSTRUCTIONS Step 13 Locating the accessories Removing the marquee support bracket Using a Philips head screwdriver remove the two screw...

Page 17: ...is Step is Complete Step 18 Removing the marquee support bracket Check Box When This Step is Complete Remove the lighted marquee Then remove the wooden pedestal circled that the marquee is sitting on...

Page 18: ...acrylic lollipops Check Box When This Step is Complete Open the rear access doors on the header section section 3 Remove the FOUR acrylic lollipops that are stored in this cabinet Check Box When This...

Page 19: ...tions in section 1 Check Box When This Step is Complete There are FIVE electrical connections that need to be made when connecting the console to the main cabinet These FIVE connectors are stored insi...

Page 20: ...ector INSTALLATION INSTRUCTIONS Check Box When This Step is Complete Step 25 Step 26 Plugging in connection 3 Connect the TWENTY pin Molex connector Plugging in connection 2 Check Box When This Step i...

Page 21: ...Installing the left cabinet bracket Locate the metal brackets and attach with the provided bolts to the main cabinet Do not tighten Insert the other two bolts into the console side and loosely tighten...

Page 22: ...glass or the monitor on the front part of the cabinet DANGER TEAM LIFT AT LEAST TWO ABLE BODIED ADULTS MUST LIFT THE HEADER SECTION Check Box When This Step is Complete Step 33 Setting section 3 onto...

Page 23: ...lete Step 35 Securing section 3 to the main cabinet NOTE YOU MAY HAVE TO SLIGHTLY RE ALIGN THE HEADER IN ORDER TO FIT THE SCREWS Check Box When This Step is Complete Step 36 Securing section 3 to the...

Page 24: ...tep 38 Installing the acrylic panel to section 3 Locate the clear acrylic panel and install onto the top of the glass by carefully sliding the slot in the acrylic onto the top edge of the glass Check...

Page 25: ...e wire connections into the main cabinet Carefully push all FOUR connectors into the hole in the rear right corner of the header Check Box When This Step is Complete Step 42 Routing the wire connectio...

Page 26: ...tion 3 Connect the TWO PIN Molex connector with the two BLACK wires Check Box When This Step is Complete INSTALLATION INSTRUCTIONS Step 43 Installing wire connection 1 Carefully connect the 24 PIN Mol...

Page 27: ...s Step is Complete Step 47 Prepping the upper section 3 On the upper section of the header Section 3 turn the mounting screws counter clockwise so that 1 4 of the threads are exposed Make sure that th...

Page 28: ...hted marquee Check Box When This Step is Complete Step 51 Securing the lighted marquee WARNING DO NOT RELEASE THE MARQUEE UNTIL ALL SIX OF THE SCREWS ARE SECURED TO THE HEADER SECTION Check Box When T...

Page 29: ...p 53 Routing the wire connections into section 3 Pass both sets of wires through the access hole in the header section Check Box When This Step is Complete Step 54 Connecting the wire connections for...

Page 30: ...to place Ensure they are straight and not at angle Check Box When This Step is Complete Step 56 Installing the acrylic lollipops Continue to install each of the lollipops into the receiving brackets C...

Page 31: ...he top of the tube Check Box When This Step is Complete Step 59 Installing the right acrylic tube With the assistance of another able bodied adult have them hold the candy tube assembly up against the...

Page 32: ...get all aligned before tightening them Check Box When This Step is Complete Step 62 Installing the right acrylic tube After the bottom is secure install the screws in the upper part of the assembly a...

Page 33: ...access door in the header section locate the TWO PIN connector you earlier pushed through and into the cabinet This hole is on the lower RIGHT front side from where you are standing Connect the cable...

Page 34: ...e at your location however it is always best to ensure that the selector switch is set to the proper power before turning the game on The selector switch is located on top of the power supply The swit...

Page 35: ...VERSION 1 0 VERSION 1 0 V 2017 12 14 V 2017 12 20 INITIAL SOFTWARE INSTALLED AT FACTORY ENHANCED AUDIT FEATURE CLEARING PC SOFTWARE I O SOFTWARE SOFTWARE VERSION REASON FOR CHANGE DATE PC SOFTWARE VER...

Page 36: ...Play 3 Device must lockout after 10 00 is inserted Gum Drop will not accept more than 5 00 maximum V E R S I O N 1 1 The installed software version can be viewed at any time by viewing the label on t...

Page 37: ...st per play balls per play ticket output and additional features Other intricate functions can be changed including the style and type of bonus the levels within the bonus and the values of different...

Page 38: ...so that operators may be able to quickly and easily change any and all values shown on the nine score channels and the nine bonus score channels To enter the software push and hold the ENTER button Yo...

Page 39: ...to eliminate confusion among players By selecting the NUMBER option this will change the score state to pay out a fixed number of tickets Whatever number the operator chooses will appear within the s...

Page 40: ...and the MAX to 10 and then the machine will determine what number to show within the range of 5 10 after each win The operator can change the values of each score channel while in bonus play by selec...

Page 41: ...NDY spaces or more difficult play with less spaces This selection should correspond to the number of balls awarded during the bonus Bonus Score Values By selecting the CANDY NUMBER option the player w...

Page 42: ...w you to enter a value for that level GUM DROP MAIN MENU OPTIONS Bonus Score Values The operator can select the number range by determining the MIN and the MAX If both values are equal the number will...

Page 43: ...the level to 3 you see how 3 levels are illuminated and then allow you to select a certain value for each level We have selected 3 levels as the default as this is the perfect balance between value a...

Page 44: ...ee how 5 levels are illuminated and then allow you to select a certain value for each level Bonus Levels By increasing the level to 6 you see how 6 levels are illuminated and then allow you to select...

Page 45: ...tion The operator must enter the cost per credit and the cost per ticket in order for the formula to show the proper payout If these are not set to the operators location then this will not show the p...

Page 46: ...thin this option you can see the amount of times based on percentage that the ball entered each score channel This is allows for the operator to make adjustment if necessary for large score state valu...

Page 47: ...given between the start of each play and when the game will automatically drop the ball The default time is set to 20 seconds We recommend that the time should be longer in demographics where the cos...

Page 48: ...OSSIBLE TO WIN THE BONUS Please contact JET GAMES for suggestions GUM DROP MAIN MENU OPTIONS Balls Per Play Setting the number of balls per play The operator can select the number of balls given per p...

Page 49: ...el this will ensure the best sound quality Clearing The Credits Owed Clearing the credits owed Should you wish to or need to clear the credits owed the operator can quickly clear the credits by select...

Page 50: ...n pushing the enter button again to clear Discarding Changes and Exiting the Software Discard changes and exit If you wish to exit the software WITHOUT saving any changes made select the DISCARD CHANG...

Reviews: