Installation

5

Windows can be fitted either during the course of 
construction or fitted into preformed openings at 
a later stage. Building-in factory finished windows 
during the course of construction should be avoided if 
possible, if however this is not possible, the materials 
adjacent to the opening should not be fitted tightly in 
order to prevent distortion of the frame. Fully finished 
windows should be installed into preformed openings. 
Side tolerances between the frame and the structural 
opening should not exceed 10mm on each side. 
It is recommended that the opening into which the 
window is to be installed is 12mm larger (6mm each 
side) in both height and width than the overall window 
sizes given in the table below:

When not building-in, openings can be formed 
using either proprietary templates or site constructed 
templates, these templates should produce openings 
that are between 10mm to 20mm larger than the overall 
actual window size depending on the the installation 
method.
Lintels should be positioned clear of the window head as 
windows must not be used for load bearing. Pre-formed 
openings should be larger than the frame that will be 
fitted into them. A tight fit could cause distortion of the 
frame. A clearance of at least 5mm should be provided 
all around the frame, however, clearances more than 
15mm will be difficult to seal after the frame is installed. 
Building regulations require the installation to achieve a 
level of airtightness

We recommend the Illbruck i3: system for high levels 
of air tightness. There should be a correctly installed 
damp proof course around all the openings to prevent 
moisture moving from the outer construction to the 
inner construction. 
There should be adequate insulation fitted between the 
inner and outer construction to reduce heat loss at the 
window openings. The window should be positioned 
in the opening such that it covers at least 30mm of the 
insulation.
Note: 
•  Proprietary insulating products may have particular 

requirements for installation. In these cases follow the 
manufacturer’s recommendations.

•  When installing windows into timber frame 

constructions, care must be taken to allow for 
differential movement between the external 
construction and the timber frame and for fire 
stopping at the window opening. 

• 

 Windows should be fitted without distortion. They 
should be levelled and upright and the position 
checked with a spirit level. 

•  

Windows should be secured in the openings by fixings 
at each side positioned approximately 150mm from 
the top and bottom of the window and then at no 
more than 450mm centres in between. Fixings are not 
required at the top and bottom for frame widths up to 
1800mm, for wider frames up to 3600mm, a central 
fixing will be required. When securing the frame care 
must be taken not to distort the components as  this 
could impair the operation of the window. 

Actual

Actual

Module Size

Frame Width

Frame Height

1200 x 1050mm

1195mm

1045mm

1200 x 1200mm

1195mm

1195mm

1770 x 1350mm

1765mm

1345mm

915 x 1050mm

910mm

1045mm

STORMSURE/STORMSURE /REGENCY      

FITTING & FIXING GUIDELINES

JWW3203_18708_Stormsure _Fit_instruct_A5.indd   5

JWW3203_18708_Stormsure _Fit_instruct_A5.indd   5

09/02/2021   11:52

09/02/2021   11:52

Summary of Contents for Stormsure

Page 1: ... injury during manual handling and particular precautions are required when working at height The following instructions and recommendations must be followed Failure to do so may affect the guarantee and the long term performance of the window and glazing JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 1 JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 1 09 02 2021 11 52 09 02 2021 11 52 ...

Page 2: ...04 Installation 05 Hinge Operation 06 Maintenance 08 Performance 08 Guarantees 09 Troubleshooting Guide 11 IMPORTANT Installation of these Windows should be carried out by a minimum of two people Prior to installing the product please ensure you have carefully inspected each package In the unlikely event you discover any damage or defect do not proceed to fit until you have notified JELD WEN 0845 ...

Page 3: ...uld be in no longer than 7 years In more severe locations it is recommended to carry this out more frequently to maintain protection Microporous paint that is either water or solvent oil based can be used Manufacturer s instructions must be followed paying particular attention to temperature at the time of application Cleaning When cleaning the outside or inside of windows fitted with projecting h...

Page 4: ...use and encourage hot humid conditions There should be space for air to circulate around the windows Factory finished and or glazed windows need extra care to avoid damage to the painted surfaces or glass They should be stored vertically to prevent water accumulating on top of the glazing units When being removed from storage windows should be lifted not dragged They should be lifted by the main f...

Page 5: ...evels of air tightness There should be a correctly installed damp proof course around all the openings to prevent moisture moving from the outer construction to the inner construction There should be adequate insulation fitted between the inner and outer construction to reduce heat loss at the window openings The window should be positioned in the opening such that it covers at least 30mm of the i...

Page 6: ...rt the key head into the groove of the locking button and rotate in the direction indicated to unlock 2 Repeat to top and bottom hinge Note If restrictor has been fitted it must be released prior to attempting the easy clean function 3 Safely holding the sash push towards the centre of the opening The sash will slide to its limit on the hinge 4 By closing the sash the hinges return to the fire egr...

Page 7: ...on Gently lift the restrictor arm A to disengage restrictor and push sash open Some top hung sashes will have a restrictor fitted to both sides Side hung operation Gently pull the restrictor arm A towards you and push sash open Hinge Operation cont 6 STORMSURE STORMSURE ENERGY REGENCY FITTING FIXING GUIDELINES JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 7 JWW3203_18708_Stormsure Energy _F...

Page 8: ... drainage holes channels and spaces are kept clear Use a soft flexible brush or pipe cleaner with care to remove obstructions Leaded lights Like any natural lead product exposed to the environment lead profile will undergo certain atmospheric transformation This is perfectly natural and it will eventually settle down to take on the traditional weathered lead appearance so admired in ancient buildi...

Page 9: ...oat of paint within three months of purchase and one month if basecoat stained If primed and in particular basecoat stain finishes have deteriorated because of prolonged exposure the surface must be properly prepared and re primed before finishing and a knotting solution should be applied over any visible knots Take care not to paint over any form of weatherstrip as this will adversely affect the ...

Page 10: ...o repairs or alterations to the surrounding buildings have occurred which are detrimental to the joinery performance No failure of the coating has occurred caused by failure of ancillary products or glazing No damage to the coatings has occurred prior to or during installation No damage to the coating has occurred caused by bad maintenance of the building or poor design of the building JWW3203_187...

Page 11: ...b and level Have you fitted the window in too small an opening pinching the frame Has the handle been properly engaged Are you using the correct key How do I adjust the window height width If you have ordered the window too large for the opening a new window should be ordered Taking care to ensure correct dimensions guidance is given within the JELD WEN catalogue Any alteration to the product size...

Page 12: ...Bar Oak Casement SS MF JWW 3203 NOV20 18708 www jeld wen co uk STORMSURE STORMSURE ENERGY REGENCY FITTING FIXING GUIDELINES 04 NOV20 JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 12 JWW3203_18708_Stormsure Energy _Fit_instruct_A5 indd 12 09 02 2021 11 52 09 02 2021 11 52 ...

Reviews: