4.2 Installation and start-up, built in manual fill water tank
Open then lift the front of the machine and
push it backwards. Remove the blue fill cap
marked “Water”. Fill with approx. 5 litres of
cold water. Replace the blue fill cap and close
the front of the machine.
Connect the enclosed cable with plug to a
protective earthed electrical socket,
230VAC/50Hz. Connect the other connection
to the switched socket on the back of
the machine. Then ensure that the switch (3)
on the back of the machine is in the “On”
position “1”.
Check that the red LED (1) is illuminated with
a fixed red light. The machine heater tank is
filled with water and heating begins. The first
fill from the manual fill tank takes approx.
1 minute.
After approx. 5 minutes the red LED (1)
should extinguish and the green LED (2)
should shine with a fixed green light. The
machine has then heated the water to
a pre-set temperature.
1.
2.
3.
4.
4.3 Installation of drink cartridges
Begin by removing the cartridge packaging. Then remove the cartridge bracket as
per figures 7 to 9. This part of the cartridge
is not used
in this vending machine.
Note: Never remove the rubber band.
Figure 7
Figure 8
Figure 9
Summary of Contents for QUATTRO
Page 1: ...QUATTRO SERVICE MANUAL English GB...
Page 33: ...QUATTRO Rev A 2012 09 10 Service manual 32...
Page 34: ...QUATTROjskjsdfdsfdzxczxczxczxczxc QUATTRO Rev A 2012 09 10 Service manual 33 2 3 1 14 Front...
Page 36: ...QUATTROjskjsdfdsfdzxczxczxczxczxc QUATTRO Rev A 2012 09 10 Service manual 35 2 3 4 1 15 Casing...
Page 55: ...QUATTRO Rev A 2012 09 10 Service manual 54 25 Wiring diagram sensors...
Page 57: ...QUATTRO Rev A 2012 09 10 Service manual 56 27 Wiring diagram valves and button keypad...