
87/152
BATTERIES
Battery charging is achieved through the alternator coupled to the engine or through use of the
220 V shore charger.
Keep the batteries charged enough (essential to ensure them a correct service life).
Make the most of time alongside to use the 220 V shore charger so as to start out sailing with
fully charged batteries.
Always check the condition of the batteries and charge system before putting to sea.
BATTERY CHARGER
Operation
The battery charger operates based on a signal processor that converts alternating current
(220V or 110V) into a direct current (12V). The operation of the charger is fully automatic, after
selecting the type of battery and load type (Refer to the instructions for use).
Voltmeter
Location: Electrical panel
Read the instructions for maintenance recommendations
9
E
L
E
C
T
R
IC
A
L
E
Q
U
IP
M
E
N
T
Summary of Contents for SUN ODYSSEY 50DS
Page 1: ...SUN ODYSSEY 50DS OWNER S MANUAL C ROISIERE 134949 Index K...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 32: ...28 152 USE STEERS FRANK OF HELP...
Page 34: ......
Page 35: ...31 152 HULL MAINTENANCE OF THE HULL LIFTING 3...
Page 38: ......
Page 48: ......
Page 49: ...45 152 STEERING SYSTEM STEERING GEAR 5...
Page 53: ...49 152 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 6...
Page 67: ...63 152 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Page 68: ...64 152 INTRODUCTION Version 2 Aft cabins 1 forward cabin Version 1 AFT cabin 2 forward cabins...
Page 72: ......
Page 85: ...81 152 ELECTRICAL EQUIPMENT GENERAL INFORMATION 12 V DC SYSTEM 110 220 V AC SYSTEM EQUIPMENT 9...
Page 88: ......
Page 104: ...100 152 Conditioned air outlets Control box...
Page 108: ...104 152 Earthing plate Ref 4 Remote control Master switch Ref 5 Seawater inlet Ref 6...
Page 113: ...109 152 INTERFACE Location Chart table 9 ELECTRICAL EQUIPMENT...
Page 114: ......
Page 115: ...111 152 ENGINE GENERAL INFORMATION ENGINE FITTING 360 DOCKING VERSION 10...
Page 118: ...114 152 ENGINE FITTING...
Page 119: ...115 152 DIAGRAM LOCATION 10 ENGINE...
Page 124: ...120 152 FUEL SUPPLY VALVE...
Page 144: ......
Page 145: ...141 152 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 11...
Page 146: ...142 152 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm...
Page 149: ...145 152 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 12...
Page 152: ......
Page 154: ......
Page 155: ...151 152...
Page 156: ...152 152...