
75/114
WATER DRAINAGE SYSTEM
Waste water from the sink, washbasins and heads is drained off by thru-hull fittings with ball
valves (the valve is closed when the valve handle is perpendicular to the hose, the valve is
open when the valve handle is in line with the hose).
All the floors have holes (limber holes) for the water flow.
A watertight bilge tray under the engine receives the possible oil leaks.
A main sump above the ballast collects the water coming from the boarded floor.
The main sump is partially drained by an electric or a manual pump. Regularly dry the sump
with a sponge.
MAINTENANCE
RECOMMENDATION
- Regularly check the valves and thru-hull seacocks for proper operation and
watertightness.
- Turn off the valves when the water system is not in use.
- Visually check the water pump flow.
- Check the clamps and flexible hose connections for tightness.
- Pay attention to the seals for condition.
- Regularly make sure that the strum box and bilge are perfectly clean.
- Immediately switch off the electric system in case a pump is running while all the water
supplies are turned off.
- In case of a leak check the system.
WARNING
The bilge pump system is not designed to provide buoyancy to the boat in case of damage.
The bilge pump system is designed to drive out the water being either sea spray or leaks but
absolutely not the water coming through a hole in the hull, this hole being the result of a
damage.
7
PLUMBING
Summary of Contents for SUN ODYSSEY 39DS
Page 1: ...SUN ODYSSEY 39DS OWNER S MANUAL C ROISIERE 902138 Index K...
Page 2: ......
Page 8: ......
Page 9: ...5 114 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Page 14: ......
Page 24: ...20 114 EMERGENCY TILLER...
Page 26: ......
Page 27: ...23 114 HULL CONSTRUCTION MAINTENANCE OF THE HULL LIFTING INSTRUCTIONS TO REPAIR THE GEL COAT 3...
Page 28: ......
Page 34: ......
Page 40: ......
Page 44: ......
Page 45: ...41 114 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 5...
Page 60: ......
Page 66: ......
Page 67: ...63 114 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 68: ...64 114 2 CABINS...
Page 72: ......
Page 73: ...69 114 PLUMBING WATER TANK FILLING FRESH WATER SYSTEM GAS SYSTEM DRAINAGE SYSTEM SEWAGE 7...
Page 76: ...72 114 THRU HULL FITTING THRU HULL FITTING CLOSED THRU HULL FITTING OPEN...
Page 84: ......
Page 88: ......
Page 94: ......
Page 102: ...98 114 ENGINE WATER INTAKE VALVE Thru hull fitting with engine water inlet valve...
Page 108: ......
Page 109: ...105 114 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 112: ......
Page 113: ...109 114 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 116: ......
Page 118: ......