106/114
LAUNCHING RECOMMENDATIONS
A lot of skill and care is required to commission your JEANNEAU boat. The proper working of
all your boat's equipment is the result of the quality of the commissioning operations.
The initial launching and the first tests of the different equipments shall be carried out by your
JEANNEAU dealer or agent so you can expect to enjoy the warranty in case of some
equipment failure.
If later you have to launch your boat yourself, you should take the following precautions:
BEFORE LAUNCHING
- If your boat is to be fitted with sounder and speedometer, allow for the relevant fittings and
their installation.
- Check the water intake strain box for cleanliness.
- Check the engine and reduction gear oil levels (refer to engine manual).
- Turn off the engine cooling water drain valves.
- All the optional accessories shall be sealed with paste.
- Retract the speedometer into its housing (it may be damaged by the handling belts).
- For the on-line engines, check the anode at the end of the shaft is in place. Check the nut
tightening (the lock washer shall be turned over onto the nut). The anode shall not be
painted.
- Turn off all the water inlet and drain valves (sink, washbasin, heads, engine).
Summary of Contents for SUN ODYSSEY 39DS
Page 1: ...SUN ODYSSEY 39DS OWNER S MANUAL C ROISIERE 902138 Index K...
Page 2: ......
Page 8: ......
Page 9: ...5 114 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Page 14: ......
Page 24: ...20 114 EMERGENCY TILLER...
Page 26: ......
Page 27: ...23 114 HULL CONSTRUCTION MAINTENANCE OF THE HULL LIFTING INSTRUCTIONS TO REPAIR THE GEL COAT 3...
Page 28: ......
Page 34: ......
Page 40: ......
Page 44: ......
Page 45: ...41 114 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 5...
Page 60: ......
Page 66: ......
Page 67: ...63 114 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 68: ...64 114 2 CABINS...
Page 72: ......
Page 73: ...69 114 PLUMBING WATER TANK FILLING FRESH WATER SYSTEM GAS SYSTEM DRAINAGE SYSTEM SEWAGE 7...
Page 76: ...72 114 THRU HULL FITTING THRU HULL FITTING CLOSED THRU HULL FITTING OPEN...
Page 84: ......
Page 88: ......
Page 94: ......
Page 102: ...98 114 ENGINE WATER INTAKE VALVE Thru hull fitting with engine water inlet valve...
Page 108: ......
Page 109: ...105 114 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 112: ......
Page 113: ...109 114 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 116: ......
Page 118: ......