BILGE PUMP SYSTEM
PROCEDURE TO BE FOLLOWED
- Switch on the electric bilge pump.
- If necessary activate the manual pump.
- Identify the source of the leak by tasting the water and decide on the relevant action to
be taken:
• freshwater = watertank leak.
• seawater = breach of hull.
ELECTRIC BILGE PUMP
Operation:
The electric bilge pumps are connected to the 12V service circuit. To enable operation the
12V circuit must be activated by turning on the battery switches.
You can energize the electric bilge pump from the instrument panel.
Electric bilge pump
Engine compartment
Capacity: 30 l / minute
Electric bilge pump
Wheelhouse
Capacity: 30 l / minute
2
S
A
F
E
T
Y
Summary of Contents for MERRY FISHER 855 OFF SHORE
Page 1: ...MERRY FISHER 855 OFF SHORE OWNER S MANUAL 993650 Index B...
Page 2: ......
Page 4: ......
Page 7: ...3 104 HISTORY OF UPDATES Index A 12 2014 Index B 01 2015...
Page 8: ......
Page 10: ......
Page 16: ......
Page 27: ...23 104 SUPPLY VALVE FUEL Location On the fuel tank 2 SAFETY...
Page 29: ...25 104 SCHEMA BILGE PUMP SYSTEM 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SAFETY...
Page 33: ...29 104 HULL MAINTENANCE OF THE HULL LIFTING 3...
Page 36: ......
Page 44: ......
Page 48: ......
Page 49: ...45 104 STEERING SYSTEM STEERING GEAR 5...
Page 51: ...47 104 SCHEMA 5 1 2 3 4 5 6 7 8 9 9 OPTION 10 STEERING SYSTEM...
Page 53: ...49 104 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 6...
Page 54: ...50 104 INTRODUCTION DECK SALOON INTERIOR ACCOMMODATION...
Page 58: ......
Page 68: ......
Page 69: ...65 104 ELECTRICAL EQUIPMENT 12 V DC SYSTEM ELECTRICAL CIRCUIT 110 220 V EQUIPMENT 8...
Page 83: ...79 104 ELECTRONIC LAYOUT OF COMPONENTS LEAD LINES LOCH SPEEDO SOUNDER 8 ELECTRICAL EQUIPMENT...
Page 85: ...81 104 ENGINE GENERAL INFORMATION ENGINE FITTING 9...
Page 95: ...91 104 LAUNCHING LAUNCHING RECOMMENDATIONS 10...
Page 96: ...92 104 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm 1150 4000...
Page 98: ......
Page 99: ...95 104 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 102: ......
Page 103: ...99 104 APPENDIXES 1 12...
Page 107: ...103 104 12 APPENDIXES...
Page 108: ...104 104...