- 34 -
5.4.2 Bilge pumps and drainage
General points
- The inner moulding of the hull has channelling: the drainage channels. The drainage
channels allow the water to drain down to the lowest point in the boat, where it can be
discharged. So it is important to allow the water to flow freely down to this lowest point of the
boat, which includes.
- Regularly cleaning the lowest point of the boat and the drainage channels.
Diagram of the layout - Bilge pumps
Reference
Designation
Rate
1
Manual bilge pump
32p/minute
(*)
2
Manual bilge pump lever
3
Electric bilge pump (All versions)
129p/minute
3’
Electric bilge pump x2 (Petrol version only)
129p/minute x2
4
Electric bilge pump switch
(*) 45 strokes/minute
If 70 stroke/minute: rate 35p/minute
Summary of Contents for Leader 40
Page 1: ...L E A D E R 4 0 OWNER S MANUAL 165584 Index D ...
Page 2: ......
Page 10: ......
Page 16: ......
Page 20: ......
Page 28: ......
Page 55: ... 55 7 2 7 Layout of the deck wiring looms DC circuit 7 PP1 PQ PP2 PP3 DC INSTALLATION ...
Page 75: ... 75 Location Deck harness AC circuit 7 PQ10 4CL PCL12 PQCL10 G2 AC SYSTEM ...
Page 82: ......
Page 84: ... 84 Gas cylinder locker Cooker Gas supply valve ...