- 96 -
The air conditioning is running:
- Switch the air-conditioning circuit-breakers ON.
- Select the temperature of each compressor using the control units.
- Refer to the manufacturer's instructions for use and maintenance.
- When the air-conditioning is running, check visually that the sea water has
been fully drained.
- Never start the generator when the climate function is already on.
- Always turn off the air conditioning before turning off the generator.
- Regularly check and clean the sea water filter placed on the sea water intake
through-hull fitting.
- Close the sea water intake valve;
- Unscrew the top of the filter;
- Clean the strainer;
- Put everything back in place.
- Clean the air filter (located in the compressor) regularly for maximum
performance of the installation.
- Clean the cooling coil at least once a year.
- To prevent the air-conditioning circuit from freezing: never run the system
when the seawater temperature drops below 5 degrees C.
- Winter Storage: drain the whole sea water system.
- The cooling gas circuit needs no maintenance.
Summary of Contents for Leader 40
Page 1: ...L E A D E R 4 0 OWNER S MANUAL 165584 Index D ...
Page 2: ......
Page 10: ......
Page 16: ......
Page 20: ......
Page 28: ......
Page 55: ... 55 7 2 7 Layout of the deck wiring looms DC circuit 7 PP1 PQ PP2 PP3 DC INSTALLATION ...
Page 75: ... 75 Location Deck harness AC circuit 7 PQ10 4CL PCL12 PQCL10 G2 AC SYSTEM ...
Page 82: ......
Page 84: ... 84 Gas cylinder locker Cooker Gas supply valve ...