background image

10

ASSEMBLY

Before assembling the Blower Tubes, be sure the Main switch 

(4) is in ‘’O’’ Off position.

Fit the Blower Tube to the motor housing as shown in Fig 2. 

Check the Blower Tube is firmly secured.

Summary of Contents for ZQ561

Page 1: ...1 ZQ561 05102018 18V Leaf Blower Instruction Manual Model Ref ZQ561...

Page 2: ...packaging material You may wish to keep the packaging for future use or storage of your device Alternatively dispose of accordingly Please note that the battery from this model is also compatible with...

Page 3: ...iance before assembly vacuum tube and dust bag WARNING Read all safety warnings and all instructions Failure to follow the warnings and instructions may result in electric shock fire and or serious in...

Page 4: ...fore checking cleaning or working on the machine if the machine starts to vibrate abnormally Operate the machine only in daylight or in good artificial light Do not overreach and keep your balance at...

Page 5: ...arise in connection with the tool s construction and design 1 Damage to lungs if an effective dust mask is not worn 2 Damage to hearing if effective hearing protection is not worn 3 Health defects re...

Page 6: ...acelets and keys The battery or conductor may overheat and cause burns Charge only using the charger provided with the tool Do not place outlet tubes near eyes or ears when operating Do not cross grav...

Page 7: ...n not in use appliances should be stored indoors in dry and high or locked up place out of reach of children Check damaged parts Before further use of the appliance a guard or other part that is damag...

Page 8: ...follow the instructions given in the section protecting the environment Under extreme conditions battery leakage may occur When you notice liquid on the battery proceed as follows Carefully wipe the...

Page 9: ...er necessary rest time is required to let the charger cool down before further charging When charging is finished unplug the charger from mains socket outlet and take away the battery pack from the ch...

Page 10: ...09 PRODUCT OVERVIEW 1 Blower Tube 2 Tube Release button 3 Handle 4 Main switch 5 Battery Pack...

Page 11: ...10 ASSEMBLY Before assembling the Blower Tubes be sure the Main switch 4 is in O Off position Fit the Blower Tube to the motor housing as shown in Fig 2 Check the Blower Tube is firmly secured...

Page 12: ...ent power on jobs that were easily done before After several charge and discharge cycles the battery will attain full capacity The battery may become warm while charging this is normal and does not in...

Page 13: ...he Battery Release Button down To insert the battery pack groove along the handle and insert in the full position until the Battery Release Button bounce back to normal position again Starting Stoppin...

Page 14: ...m the tool before performing any maintenance Your tool has been designed to operate over a long period of time with a minimum of maintenance Continuous satisfactory operation depends upon proper tool...

Page 15: ...m s2 Sound pressure level Uncertainty KpA 3 0 dB 75 dB A Battery Charging Time Approx 4 Hours Battery Capacity 1500 mAh Battery Type Lithium Ion STORAGE If storing Blower for more than 30 days follow...

Page 16: ...ifferentiated waste collection centre or to a dealer providing this service Disposing of a household appliance separately avoids possible negative consequences for the environment and health deriving...

Page 17: ...JD Williams Ltd Manchester UK M60 6ES M606ESO1...

Reviews: