![JDS Uniphase Wavetek DSAM-3500B Quick Start Manual Download Page 30](http://html1.mh-extra.com/html/jds-uniphase/wavetek-dsam-3500b/wavetek-dsam-3500b_quick-start-manual_3644549030.webp)
Chapter 2
DSAM Meter Operation
Powering the Meter
14
DSAM Product Family Quick-Start Guide Rev. 001
Charging the
Battery
With the power components properly connected (see
“External Power Components” on page 12
) the DSAM
battery can be charged when outside of the meter or when
installed in the meter.
1
For typical battery charging (fast charge or maximum
capacity) and normal operational values, refer to
2
For battery charge LED indications refer to
The charging time will be the same whether the power
is on or off.
When you power the meter directly with an AC or a DC
power source, this source automatically charges the
battery while providing power on a separate path with no
degradation to the meter’s direct power. When the battery
is fully charged, the charger module provides a mainte-
nance charge from the power source.
Interpreting
the Battery
LED’s
There are two LED indicator lights located on the bottom
of your DSAM battery (refer to
) – the
red “CHARGE” LED and the green “OK” LED.
NOTE
You can power the DSAM meter and recharge the bat-
teries at the same time.
Table 5
Battery Charge and Operation Values
Item
Charge Time
Battery
11 AH (Amp Hour)
Fast Charge Period
> 7.0 Hours
Normal Operation
5.0-8.0 Hours typical
Complete Charge
Approximately 10 to 12 Hours
Summary of Contents for Wavetek DSAM-3500B
Page 2: ......
Page 3: ...DSAM Product Family Series Wavetek Series Field Meter Quick Start Guide...
Page 4: ......
Page 10: ...Table of Contents vi DSAM Product Family Quick Start Guide Rev 001...
Page 16: ...About This Guide Conventions xii DSAM Product Family Quick Start Guide Rev 001...
Page 87: ......