![background image](http://html1.mh-extra.com/html/jcb/5-5-21-roto/5-5-21-roto_quick-start-manual_3591366012.webp)
12
Please see operator manual for full details.
Load Management Screen
Load Management System
The Load Management System is designed to keep the machine stable in any situation. The maximum
capacity of the machine (D) will change depending on a number of factors including:
Machine Level
Attachment
Stabiliser Position
Slew Angle
Lift Reach
Lift Height
Always operate within the safe working limits of the machine.
Boom Configuration –
Shows live position of boom
A
– Boom Extension
B
– Boom Angle
C
– Radius
(Distance from centre of slew to load)
D
– Boom Height
A
– Percentage of
Maximum Capacity
currently in use
B
– Maximum Capacity in
current configuration
C
– Load currently lifted
A
2
– Overload Warning
– The only services
available retract and
winch down.
A
3
– Amber Warning
– Over 80% Capacity
F
– Attachment used
B
A
3
C
A
2
A
F
C
B
A
D
B
C