5. Wrap the opposite end of the open jacket around the riser
ring as shown in Figure 5.  Be certain that the bottom of the
protective jacket is tucked-in all the way around the riser ring
as shown.  

6. “Zip” up the Velcro strip and pull the draw cord closed as
required as shown in Figure 6. The protective jacket should
now be securely fastened all the way around the riser ring at
the bottom and top end of the jacket and should be closed
securely forming a protective closure around the connector
panel.  

7. Repeat the process for the other connector panel.

NOTE: Once attached, it is recommended the Protective Jackets be stored inside the molded assemblies at each end of the
DP3. Note that each end-cap has a storage space inside, and can accommodate a jacket once the Velcro strip has been
"unzipped" and the jacket has been unwrapped from the module riser (trim piece). 

To implement this procedure, unhook the  second short Velcro tab (shown being attached in Figure 4) from the slotted
opening in the riser. Do not dis-connect the first short Velcro tab (which was affixed as shown in Figure 2). 

Stuff the jacket into the storage space inside the end-cap. To ensure retention of the jacket during storage in this space, be
sure to keep the first Velcro tab (closest to the end of the DrivePack unit) firmly attached through the slot. For ease of
removal from the storage space in the end-cap, orient the elastic drawstring towards the top of the compressed jacket, as it
resides in the end-cap. Pulling on the drawstring will then un-compress the stored jacket, and reveal it for re-installation
on the riser when required.

Figure 6

Figure 5

Summary of Contents for VERTEC DrivePack DP Series

Page 1: ...JBL VERTEC DP Series DrivePack DP3 DPIP Operator s Guide...

Page 2: ...2...

Page 3: ...where they exit from the apparatus 11 Only use attachments accessories specified by the manufacturer 12 Use only with the cart stand tripod bracket or table specified by the manufacturer or sold with...

Page 4: ...o alert the user to important operating or maintenance instructions FCC COMPLIANCE NOTICE This device complies with part 15 of the FCC rules Operation is subject to the following two conditions 1 This...

Page 5: ...Use Part 2 Immunity EN 61000 4 2 1995 A1 1999 A2 2001 Electrostatic Discharge Immunity Environment E2 criteria B 4 kV Contact 8 kV Air discharge EN 61000 4 3 2003 Radiated Radio frequency Electromagn...

Page 6: ...erial and with load impedances of 4 8 or 16 Ohms for low and mid frequency channels and 8 or 16 Ohms for the high frequency channel Package Contents Operator s Guide this document VT48XXDP loudspeaker...

Page 7: ...el is applied iii SOLID illumination indicates thermal protection is in the second stage of protection and amplifier shut down may occur if immediate action is not taken to correct the external reason...

Page 8: ...for their specific VERTEC DP line array system configuration See Table 1 for custom application wiring and connector information NOTE Parts not provided CAUTION Do not exceed 80 current rating of any...

Page 9: ...ages within the rated voltage windows AC POWER MODULE POWER Indicator Blue LED located near power inlet lights when AC power applied Amp READY Indicator Green LED near power inlet on during normal ope...

Page 10: ...f the jacket See Figure 2 2 Open the center Velcro tab and insert through the opening in the module riser See Figure 3 3 Next wrap the left side of the cover around the bottom edge of the riser Insure...

Page 11: ...ge space inside and can accommodate a jacket once the Velcro strip has been unzipped and the jacket has been unwrapped from the module riser trim piece To implement this procedure unhook the second sh...

Page 12: ...authorization from JBL Customer Service Monday through Friday 8 00am 5 00pm Pacific Coast Time In the U S A 800 8JBLPRO 800 852 5776 www jblproservice com On the World Wide Web www jblpro com Outside...