NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No
Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No
Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
Maintenance
Before carrying out maintenance, always switch the device off and disconnect it from the mains.
Allow the equipment to cool down.
- Clean the station screen with a glass
cleaner or a damp cloth.
- Use a damp cloth to clean the casing
and the tool. Alcohol can only be used
to clean the metal parts.
- Periodically check that the metal parts
of the tool and stand are clean so that
the station can detect the tool’s status.
- Maintain the tip surface clean and
tinned prior to storage in order to avoid
tip oxidation. Rusty and dirty surfaces
reduce heat transfer to the solder joint.
- Periodically check all cables and tubes.
- Replace any defective or damaged pieces.
Use original JBC spare parts only.
- Replace a blown fuse as follows:
1.
Pull off the fuse holder and remove the
fuse. If necessary use a tool to lever it off.
- Repairs should only be performed by a JBC authorized technical service.
Clean periodically
Fuse holder
Fuse holder
Fuse
2.
Press the new fuse into the fuse holder
and replace it in the station.
12
Summary of Contents for NAE Series
Page 1: ...INSTRUCTION MANUAL NAE 2 Tool Nano Control Unit...
Page 14: ...Notes 14...