background image

ø 0,3

0,2 x 0,1

0,7

3,5

Ø2,5

Ø2,5

C115

C11

C105 /

C105 / C115

C115

C11

C105 /

C105 / C115

C115

C11

C105 /

C105 / C115

NAE

Control Unit

PORT

2

ROBOT

PEDAL

2

NAE

Control Unit

PORT

2

ROBOT

PEDAL

2

ROBOT

C115

C11

C105 /

C105 / C115

19:29

19:29

Port

2

Actual Temp. 25ºC

NT105

ºC

Power

45%

Selected 350ºC

350

Port

2

NT105

Hibernation

19:29

Port

2

Actual Temp. 25ºC

AN115

Hibernation

19:29

ºC

Power

45%

Selected 350ºC

350

Port

2

AN115

No

Yes

NAE

Control Unit

PORT

2

ROBOT

PEDAL

2

PORT

1

PEDAL

2

NAE

Control Unit

PORT

2

ROBOT

PEDAL

2

NAE

Control Unit

PORT

2

ROBOT

PEDAL

2

ROBOT

C115

C11

C105 /

C105 / C115

19:29

19:29

Port

2

Actual Temp. 25ºC

NT105

ºC

Power

45%

Selected 350ºC

350

Port

2

NT105

Hibernation

19:29

Port

2

Actual Temp. 25ºC

AN115

Hibernation

19:29

ºC

Power

45%

Selected 350ºC

350

Port

2

AN115

No

Yes

NAE

Control Unit

PORT

2

ROBOT

PEDAL

2

PORT

1

PEDAL

2

*Important 

It is essential to insert the 

cartridges up to the re-

ference ring for a proper 

connection.

Tweezer Chisel

Blade

Tweezer

Conical Bent

Changing Cartridges

Save time and change cartridges safely without having to switch the station off.

Removing

Inserting

Aligning

Place the cartridge into the 
extractor slot (1) and pull 
the tweezers to remove the 
cartridge (2).

Push the tweezers onto 
the new cartridge until the 
reference ring*.

Use the holes to rotate 
the cartridges for a proper 
alignment.

Compatible Cartridges

The Nano Tweezers 

NP115 

and

 AN115

 work with 

C115

 cartridges. Find the model that best suits your 

soldering needs on 

www.jbctools.com

1

2

Reference 
Ring

Reference 
Ring

OK

OK

TOOL

EAR

THING FUSE

AUX

USE ONL

WITH A 250 

V FUSE

OK

OK

TOOL

EAR

THING FUSE

AUX

USE ONL

WITH A 250 

V FUSE

Changing Cartridges on AN115 Tweezers

not aligned

aligned

Turn the tweezer’s hand wheel forwards or backward for a vertical 
cartridge alignment. One tip lines up with the other.

Vertical Cartridge Alignment

6

Summary of Contents for NA103

Page 1: ...NA103 NA104 Updating Kit C115 Nano Handle Updating Kit C115 Nano Tweezers INSTRUCTION MANUAL...

Page 2: ...1 unit Ref 0033002 Packing List The following item is included in Ref 0033103 This manual corresponds to the following references 0033103 NA103 0033104 NA104 Updating Kit C115 Nano Handle Updating Ki...

Page 3: ...nection Example with 2 Nano Handles Power Socket Main Switch NT115 Nano Handle NT115 Nano Handle Note To use NT115 A AN115 A and C115 cartridges with control unit versions NAE A and NAE B the its soft...

Page 4: ...ate the cartridges for proper alignment Important It is essential to insert the cartridges up to the re ference ring for a proper connection Reference Ring 1 2 Compatible Cartridges Reference Ring 19...

Page 5: ...Handle NT115 works with C115 cartridges Find the model that best suits your soldering needs at www jbctools com Conical Chisel Bevel Knife Conical bent Reference Ring NT115 NT115 NP115 T245 NT115 NT1...

Page 6: ...ridge into the extractor slot 1 and pull the tweezers to remove the cartridge 2 Push the tweezers onto the new cartridge until the reference ring Use the holes to rotate the cartridges for a proper al...

Page 7: ...s unplug the tool Check periodically that the metal parts are clean to ensure it is detected when on the stand Always use a damp cloth or alcohol Periodically check all cables and tube connections Rep...

Page 8: ...at can cause inflammable products to ignite Avoid flux coming into contact with skin or eyes to prevent irritation Be careful with the fumes produced when soldering Keep your workplace clean and tidy...

Page 9: ...Notes 9 40 mm 50 mm 60 mm 80 mm 100 mm 130 mm 130 mm para manuales color gris 200 mm...

Page 10: ...Notes 10...

Page 11: ...m 336 g L x W x H 9 65 x 7 28 x 1 77 in 0 741 lb NA104 Updating Kit C115 Nano Tweezers Ref 0033104 Total Net Weight 197 g 0 434 lb Package Dimensions Weight 245 x 185 x 45 mm 354 g L x W x H 9 65 x 7...

Page 12: ...an authorized recycling facility Warranty JBC s 2 year warranty covers this equipment against all manufacturing defects including the replacement of defective parts and labour Warranty does not cover...

Reviews: