jbc JT-QD Manual Download Page 3

Features

Press

Press

Do not  
press

1. 

From the main Menu, select the mode to activate the tool depending on the task.

2. 

The tool stops blowing hot air when returned to the stand.

Stand + Autostart OFF 

Stand + Autostart ON 

Pedal*

Adjust the tool holder angle to suit your work position.

Press the start/stop button to 
blow hot air.

The tool automatically starts 
blowing hot air when lifted 
from the stand.

Press the Pedal to blow hot 
air and release to stop. 
*The 

P-005

 Pedal is not 

supplied with this station.
See our website.

4

5

Another connectable tool: 

Precision Heater hose set 

Ref: TE-TB

Hot Air button 
(On / Off)

Power Socket

Optional: 
P-005 Pedal 
connection

Fuse

Equipotential 
connection

Heating 
element

Suction Tube

Ref. 0932330

Heater Hose set

Ref. JT-T1A (100V/120V)
 

JT-T2A (230V)

Stand 

Ref. JT-SD

For tripods 
and extractors

Activates the 
suction pump

USB-B connector

Update the station 
software from 
the JBC website

Adjustable Stand

Operation Modes

4

www.jbctools.com

5

Summary of Contents for JT-QD

Page 1: ...English 3 Page www jbctools com Hot Air Station without extractor desk Ref JT QD www jbctools com Deutsch 18...

Page 2: ...er Cord 1 unit Ref 0009417 100V 120V 0009401 230V Hot Air Station without extractor desk Ref JT QD Heater hose set 1 unit Ref JT T1A 100V 120V JT T2A 230V JTE Control Unit 1 unit Ref JTE 1D 120V JTE 2...

Page 3: ...d from the stand Press the Pedal to blow hot air and release to stop The P 005 Pedal is not supplied with this station See our website 4 5 Another connectable tool Precision Heater hose set Ref TE TB...

Page 4: ...lat mm mm A x B mm 1 Push the nozzle tab inwards with a screwdriver or flat nosed pliers 2 Insert the nozzle into the JT TA Heater again Turn the tool off and handle with care The heating element and...

Page 5: ...ns Edit Program This option allows you to edit or create a program First you must select the program to edit and then modify the points that make up the program Each program is composed of 9 points ea...

Page 6: ...T Handle Ref JT A 1 Ensure that the tool is turned off 2 Use a spanner to unscrew the connecting nut 3 The tube end of the new heater must be inserted so that the longitudinal rib fits into the groove...

Page 7: ...eedles Set Ref 0861660 1 Pull off the fuse holder and remove the fuse If necessary use a tool to lever it off 2 Press the new fuse into the fuse holder and replace it in the station Fuse holder Fuse h...

Page 8: ...hich can cause burns This appliance can be used by children over the age of eight and also persons with reduced physical sensory or mental capabilities or lack of experience provided that they have be...

Page 9: ...ewicht 6 7 kg 14 7lb Abmessungen 148 x 184 x 140 Nennleistung 700 W Temperaturauswahl Raumtemperatur 150 C bis 450 C 300 F bis 840 F K hlmodus T Aus Benutzt als Luftstrom mit Raumtemperatur Umgebungsb...

Page 10: ...tlinie 2002 96 EC m ssen elektronische Ger te am Ende ihrer Lebensdauer eingesammelt und einem autorisierten Recyclingbetrieb zugef hrt werden 0016476 1015 www jbctools com Warranty JBC s 2 year warra...

Reviews: