ENGLISH
OPERATION MANUAL
JB SYSTEMS®
3/62
iMove 7S
LAMP (RE)PLACEMENT
In case of replacement of the lamp
or maintenance, do not open the
fixture within 10 minutes until the
unit cools down after switching
off. Always unplug the unit before servicing!
Always use the same type of spare parts
(bulbs, fuses, etc.) When replacing parts,
please only genuine spare parts.
Switch off the unit and unplug the mains cable.
Wait for about 10 minutes until the unit has been
cooled down.
Unscrew the two screws on the back of the Unit
where the sign “open” is written.
Tear the lamp socket gently out of the lamp
compartment.
Unplug the old lamp. Hold the lamp socket while unplugging the lamp instead of pulling the cable!
Hold the lamp socket while pressing the new lamp gently in the socket.
Attention!
Check the label on the backside of the device or see the technical specifications in this manual
to know which lamp should be used. Never install lamps with a higher wattage!
Don’t touch the bulb with bare hands! This drastically shortens the lifespan of the lamp. If you touched the
lamp, clean it with a cloth and a little denatured alcohol. Wipe the lamp off before installing.
Put the new lamp back inside the unit. Be sure that the wires don’t touch the lamp.
Close the lamp compartment with the screws
Turn on the unit and point the beam to a white surface. Use the three adjustment screws indicated by
“lamp adjust”. Gently turn these three screws until you obtain maximum light output.
Done!
ENGLISH
OPERATION MANUAL
JB SYSTEMS®
4/62
iMove 7S
EXCHANGING/ROTATING GOBOS
ATTENTION: Install the gobos only when the unit is switched off!
Never unscrew the screws of the rotating gobo as the ball bearing will be opened. Repairing
this is very difficult!
Switch off the main supply and unplug the unit.
Open the plastic top cover (4screws)
Locate the gobo wheel and remove the fixation ring of the gobo you want to change with an appropriate
tool.
Remove the gobo and insert the new gobo.
Press the fixation-ring together and insert it in the front of the gobo.
Done!
OVERHEAD RIGGING
Important: The installation must be carried out by
qualified
service
personal
only.
Improper
installation can result in serious injuries and/or
damage to property.
Overhead rigging requires
extensive experience! Working load limits should
be
respected,
certified
installation
materials
should be used, the installed device should be
inspected regularly for safety.
Make sure the area below the installation place is free
from unwanted persons during rigging, de-rigging and
servicing.
Locate the fixture in a well ventilated spot, far away
from any flammable materials and/or liquids. The
fixture must be fixed
at least 50cm
from surrounding
walls.
The device should be installed out of reach of people
and outside areas where persons may walk by or be
seated.
Before rigging make sure that the installation area can hold a minimum point load of 10times the device’s
weight.
Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
Don’t cover any ventilation openings as this may result in overheating.
The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.